[{"_1_indicator_code":"RCR81","_2_indicator_name":"Completion of joint training schemes","_2b_indicator_code_and_short":"RCR81 Interreg: Completion of joint training schemes","_3_measurement_unit":"participants","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of  participants completing the joint trainings schemes organised by supported projects. Completion should be documented by the training organisers either through a record of the confirmed completions or by issuing certificates of completion of the training. The certificates of completion do not necessarily require a previous national certification process of the issuing organisation.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"At project completion","_13_aggregation_issues":"Double counting of participants in more than one training schemes organised by the same project should be excluded.","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 6).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In terms of links with common output indicators, indicator RCR81 is intended to be used together with RCO85. \nThe value reported for RCR81 can be equal to or lower than the value of RCO85 (for example in case some participants withdraw after the training started or in case not not all participants receive the final certification), but not higher.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"157","order_by_so":"60","order_by_output_result":"157","_0_erdf":true}
,{"_1_indicator_code":"RCO01","_2_indicator_name":"Enterprises supported (of which: micro, small, medium, large)","_2b_indicator_code_and_short":"RCO01 Firms: All firms","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"The indicator counts all enterprises that receive monetary or in-kind support from ERDF. \nThe enterprise is the smallest combination of legal units that is an organisational unit producing goods and services, which benefits from a certain degree of autonomy in decision making, especially for the allocation of its current resources. An enterprise carries out one or more activities at one or more locations. An enterprise may be a sole legal unit. Legal units include legal persons whose existence is recognised by law independently of the individuals or institutions which may own them or are members of them, such as general partnerships, private limited partnerships, limited liability companies, incorporated companies etc. Legal units as well include natural persons who are engaged in an economic activity in their own right, such as the owner and operator of a shop or a garage, a lawyer or a self-employed handicrafts-person. \n(ESTAT in references, based on Council Regulation (EEC) No. 696/93, Section III A of 15.03.1993) \nFor the purpose of this indicator, enterprises are profit-oriented organisations that produce goods and services to satisfy market needs. \nFor Policy Objective 4 (Social EuropeEurope closer to its citizens), the indicator includes also social enterprises defined by the Commission (DG GROW) as follows: “a social enterprise is an operator in the social economy whose main objective is to have a social impact rather than make a profit for their owners or shareholders. It operates by providing goods and services for the market in an entrepreneurial and innovative fashion and uses its profits primarily to achieve social objectives.”\nClassification of enterprises:  \nMicro enterprise (<= 10 employees and annual turnover ≤ EUR 2 million, or balance sheet ≤ EUR 2 million); \nSmall enterprise (10-49 employees and annual turnover >EUR 2 million -≤ EUR 10 million or balance sheet in > EUR 2 million - ≤ EUR 10 million); \nMedium enterprise (50-249 employees and annual turnover >EUR 10 million - ≤ EUR 50 million or balance sheet in EUR > EUR 10 million -≤ EUR 43 million); \nLarge enterprises (>250 employees and turnover > EUR 50 millon or balance sheet > EUR 43 million). \nIf either of the 2 thresholds (employees and annual turnover/balance sheet) is exceeded the enterprises shall be categorised in the size category above.\n(ESTAT based on EC Recommendation 2003/361/EC, Annex, Articles 2-3)\nSize of the enterprise supported is measured at the time of the application.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"It depends on the type of support: grant (see RCO02), financial instruments (see RCO03) or non-monetary (see RCO04).","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many types of support (ex: grants and financial instrument support) it receives from operations in the same specific objective. \nRule 2: Double counting removed at the level of the programme in reporting under the transmission of data in Table 8. An enterprise is counted once at the programme level regardless of how many types of support it receives from operations from the same or different specific objectives.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date for total RCO01  (CPR Annex VII, Table 5). Disaggregation of reported data by enterprise size required only for achieved values. \nRule 2: Reporting at the level of the operational programme\nNet achieved values disaggregated by size of enterprise are reported also at programme level for RCO01 (CPR Annex VII, Table 8).","_15_references":"ESTAT: Eurostat - OECD Manual on Business Demography Statistics, 2007 edition\nCommission Communication, Social Business Initiative, COM/2011/0682 final, 25 October 2011.","_16_corresponding_corporate":"CCO01","_17_notes":"Use together with indicators for forms of support (RCO02. RCO03, RCO04) as follows: RCO01=RCO02+RCO03+RCO04 - number enterprises with multiple forms of support (i.e. remove double counting). Check: RCO01<= (RCO02+RCO03+RCO04)","_18_link_to_2014_2020_common":"CO01","order_by_annex_1":"1","order_by_so":"11","order_by_output_result":"1","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO02","_2_indicator_name":"Enterprises supported by grants","_2b_indicator_code_and_short":"RCO02 Firms: Grant aided","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of enterprises receiving monetary support in the form of grants. \nFor the definition of an enterprise see RCO01.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Completion of output financed by the grant support","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 5).","_15_references":"See RCO01","_16_corresponding_corporate":"-","_17_notes":"Use together with indicator RCO01.","_18_link_to_2014_2020_common":"CO02","order_by_annex_1":"2","order_by_so":"11","order_by_output_result":"2","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO03","_2_indicator_name":"Enterprises supported by financial instruments","_2b_indicator_code_and_short":"RCO03 Firms: Non grant aided","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of enterprises receiving support in the form of loans, interest subsidy, credit guarantee, venture capital or other financial instrument. \nFinancial instruments in this context include quasi-equity, equity, guarantees, and loans as defined in Regulation EU 2018/1046, Art. 2:\n(52) ‘quasi-equity investment’ means a type of financing that ranks between equity and debt, having a higher risk than senior debt and a lower risk than common equity and which can be structured as debt, typically unsecured and subordinated and in some cases convertible into equity, or into preferred equity; \n(25) ‘equity investment’ means the provision of capital to a company, invested directly or indirectly in return for total or partial ownership of that company and where the equity investor may assume some management control of the company and may share the company’s profits; \n(34) ‘guarantee’ means a written commitment to assume responsibility for all or part of a third party’s debt or obligation or for the successful performance by that third party of its obligations if an event occurs which triggers such guarantee, such as a loan default; \n(40) ‘loan’ means an agreement which obliges the lender to make available to the borrower an agreed amount of money for an agreed period and under which the borrower is obliged to repay that amount within the agreed period;\nFor the definition of an enterprise see RCO01.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"For loans and guarantees, first payment from the bank to the final recipient of the underlying loan. For venture capital, first investment from the support in the final recipient.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_15_references":"See RCO01 for enterprises\nRegulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council of 18 July 2018.","_16_corresponding_corporate":"-","_17_notes":"Use together with RCO01.","_18_link_to_2014_2020_common":"CO03","order_by_annex_1":"3","order_by_so":"11","order_by_output_result":"3","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO04","_2_indicator_name":"Enterprises with non-financial support","_2b_indicator_code_and_short":"RCO04 Firms: Advised","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of enterprises receiving non-financial support. Enterprises are counted in the indicator if they receive the non-financial support in a structured manner such as, for example, an SMEs receiving incubator services. The support provided needs to be documented. One-off interactions (ex: phone calls for information requests) are not included. \nExamples of non-financial support include services such as (non -exclusive list): advisory services (consulting assistance and training for the exchange of knowledge and experience etc) or support services (provision of office space, websites, data banks, libraries. market research, handbooks, working and model documents etc). \nFor the definition of an enterprise see RCO01.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"The first time the enterprise received the non-financial support under the programme.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date. (CPR Annex VII, Table 5).","_15_references":"Enterprise Europe Network - Customer Relationship Management System","_16_corresponding_corporate":"-","_17_notes":"Use together with RCO01.","_18_link_to_2014_2020_common":"CO04","order_by_annex_1":"4","order_by_so":"11","order_by_output_result":"4","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO05","_2_indicator_name":"New enterprises supported","_2b_indicator_code_and_short":"RCO05 Firms: New Enterprises","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"The number of new enterprises supported. An enterprise is considered new if it did not exist three years before the enterprise applies for the support provided. An enterprise will not be considered new if only its legal form changes. The indicator covers also spin-offs.\nFor the definition of an enterprise see RCO01.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"It depends on the type of support: grant (see RCO02), financial instruments (see RCO03) or non-monetary (see RCO04).","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"See RCO01 for enterprises","_16_corresponding_corporate":"-","_17_notes":"Use together with RCO01 and indicators for form of suppport (RCO02, RCO03. RCO04).","_18_link_to_2014_2020_common":"CO05","order_by_annex_1":"5","order_by_so":"11","order_by_output_result":"5","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR82","_2_indicator_name":"Legal or administrative obstacles across borders alleviated or resolved","_2b_indicator_code_and_short":"RCR82 Interreg: Legal/admin. obstacles alleviated or resolved","_3_measurement_unit":"legal or administrative obstacles","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"Legal or administrative obstacles refer to rules, laws or administrative procedures which obstruct everyday life and the development of border regions, eligible under ETC goal. The indicator counts the number of legal or administrative obstacles that are alleviated or resvolved based on solutions identified through supported projects. The adoption and implementation of the respective solutions should take place during the implementation of the project or within one year after the project completion.","_11_data_collection":"MA monitoring system / Survey","_12_time_measurement_achieved":"During project implementation / up to one year after project completion","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 6).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In terms of links with common output indicator, RCR82 may be used together with RCO117.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"158","order_by_so":"60","order_by_output_result":"158","_0_erdf":true}
,{"_1_indicator_code":"RCO06","_2_indicator_name":"Researchers working in supported research facilities","_2b_indicator_code_and_short":"RCO06 RTDI: Researchers with improved infrastructure","_3_measurement_unit":"annual FTEs","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe and PO2 Greener Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.1 R&I capacities, RSO1.6 Contributing to strategic technologies, RSO1.7 Defence industrial capacities and capabilities, RSO2.9 Contributing to clean strategic technologies","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of researchers using directly, in their line of activity, the research facility or the equipment for which the support is awarded. The indicator is measured in terms of annual full time equivalents (FTEs), calculated according to the methodology provided in the OECD Frascati Manual 2015. \nThe project must improve the research facility or the quality of research equipment. Replacements without quality increase are excluded, as is maintenance. The research facility may be public or private. \nThe R&D vacant positions are not counted, neither areos support staff for R&D (i.e. posts not directly involved in R&D activities). If more researchers are employed in the facility as a direct consequence of the project (i.e. vacant positions filled or new posts created), the new researchers are counted in RCR102 - Research jobs in supported entities). \nAnnual FTE of R&D personnel is defined as the ratio of working hours actually spent on R&D during a calendar year divided by the total number of hours conventionally worked in the same period by an individual or a group. By convention a person cannot perform more than one FTE on R&D on an annual basis. The number of hours conventionally worked is determined on the basis of normative/ statutory working hours. A full time person will be identified with reference to their employment status, the type of contract (full time or part time) and their level of engagement in R&D (see OECD in reference, Chapter 5.3).\nFor the definition of research organisations  see RCO07.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"The researchers working in the research facility during the year when the project starts.","_13_aggregation_issues":"Rule 1: Double counting of researchers to be removed at the level of the specific objective. \nA research facility may receive support several times, which may serve different researchers.  On the other hand, they should not count the same researchers twice.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"OECD - Frascati Manual 2015","_16_corresponding_corporate":"CCO02","_17_notes":"The main purpose of this indicator is to measure the effective capacity of research facility supported.","_18_link_to_2014_2020_common":"CO25","order_by_annex_1":"6","order_by_so":"11","order_by_output_result":"6","_0_erdf":true}
,{"_1_indicator_code":"RCO07","_2_indicator_name":"Research organisations participating in joint research projects","_2b_indicator_code_and_short":"RCO07 RTDI: ROs in joint research","_3_measurement_unit":"research  organisations","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe, PO2 Greener Europe and JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.1 R&I capacities, RSO1.6 Contributing to strategic technologies, RSO1.7 Defence industrial capacities and capabilities, RSO2.9 Contributing to clean strategic technologies, JSO8.1 JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of supported research organisations that cooperate in joint research projects. A joint research project includes at least one research organisation and another partner (such as an enterprise, another research organisation etc). Cooperation in R&D activities may be new or existing, and it should last at least for the duration of the project supported. The indicator covers active participations in joint research projects, and it excludes contractual arrangements with no active cooperation in the supported project (i.e. exclude cases where partners in a framework contract do not all participate in a specific joint research cooperation).\nResearch organisations with a primary goal to conduct independently fundamental research, industrial research and experimental development and to disseminate the results of such activities by way of teaching, publication or knowledge transfer. Examples include universities or research institutes, technology transfer agencies, innovation intermediaries, research-oriented or virtual collaborative entities, and they can be public or private. (Commission Regulation 651/2014.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Values achieved measured upon completion of the supported R&D cooperation activity.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nA research institution is considered once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Commission Regulation (EU) 651/2014 declaring certain categories of aid compatible with the internal market in application of Articles 107 and 108 of the Treaty (GBER) (Article 2 (83)","_16_corresponding_corporate":"-","_17_notes":"Double counting may still be generated in cases of transregional cooperation with a project supported by more than one programme.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"7","order_by_so":"11","order_by_output_result":"7","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO08","_2_indicator_name":"Nominal value of research and innovation equipment","_2b_indicator_code_and_short":"RCO08 RTDI: Value of R+I equipment","_3_measurement_unit":"euro","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe and PO2 Greener Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.1 R&I capacities, RSO1.6 Contributing to strategic technologies, RSO1.7 Defence industrial capacities and capabilities, RSO2.9 Contributing to clean strategic technologies","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"The total (acquisition) value of the research and innovation equipment supported. \nR&D equipment includes all apparatus, tools and devices used directly to perform R&D activities. \nIt does not include, for instance, chemical substances or other consumable materials used for carrying out experiments or other research activities","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Provision or acquisition of the R&D equipment for the project supported.","_13_aggregation_issues":"No issues","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"8","order_by_so":"11","order_by_output_result":"8","_0_erdf":true}
,{"_1_indicator_code":"RCO10","_2_indicator_name":"Enterprises cooperating with research organisations","_2b_indicator_code_and_short":"RCO10 RTDI: Firms cooperating with Ros","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe, PO2 Greener Europe and JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.1 R&I capacities, RSO1.6 Contributing to strategic technologies, RSO1.7 Defence industrial capacities and capabilities, RSO2.9 Contributing to clean strategic technologies, JSO8.1 JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of enterprises that cooperate in joint research projects with research organisations.   Cooperation in R&D activities may be new or existing and it should last at least for the duration of the project supported. The indicator covers active participations in joint research projects, and it excludes contractual arrangements with no active cooperation in the supported project. \n\nDefintion of enterprise - see RCO01.\nDefinition of research organisation - see RCO07.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Values achieved measured upon completion of the supported R&D cooperation activity.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective","_15_references":"RCO01 for the definition of enterprise; RCO07 for the definition of research organisations.","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO26","order_by_annex_1":"9","order_by_so":"11","order_by_output_result":"9","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO96","_2_indicator_name":"Interregional investments for innovation in EU projects","_2b_indicator_code_and_short":"RCO96 RTDI: Value of Interregional investment","_3_measurement_unit":"euro","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Total interregional investments for innovation in the projects supported. The investments should aim at scaling up joint research and innovation projects developed interregionally through the cooperation of researchers, businesses, civil society and public administrations involved in smart specialisation strategies established at national and regional level (see COM 2017 in references).\nThe indicator covers the total eligible cost (EU and national) interregional investments for innovation in projects which involve cooperation of at least two NUTS2 regions.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Completion of output financed by the support.","_13_aggregation_issues":"Rule 1: Remove double counting within national programmes:\nInterregional investments between two NUTS2 regions supported from the same national programme should be considered only once.\nRule 2: Remove double counting across regional programmes:\nWhen interregional investments are covered by more than one programme, a given programme should report only its own investment contributing to the project(s), covering contributions to all participating regions.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"COM (2017) 376 - Communication from the Commission to the European Parliament, the Council and the European Economic and Social Committee and the Committee of the Regions on \"Strengthening innovation in Europe's regions: strategies for resilient, inclusive and sustainable growth”","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"10","order_by_so":"11","order_by_output_result":"72","_0_erdf":true}
,{"_1_indicator_code":"RCR01","_2_indicator_name":"Jobs created in supported entities","_2b_indicator_code_and_short":"RCR01 Jobs created in supported entities","_3_measurement_unit":"annual FTEs","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of jobs expressed in average annual full time equivalents (FTEs) created in line of activity supported by the project. The new positions need to be filled, and they can be full time, part time or recurring seasonally. Vacant positions are not counted. Moreover, the newly created positions are expected to be retained for more than one year after project completion. \nThe indicator is calculated as the difference between the annual FTEs filled before the project starts and one year after the project completion in the line of activity supported. \nAnnual FTE is defined as the ratio of working hours effectively worked during a calendar year divided by the total number of hours conventionally worked in the same period by an individual or a group. By convention a person cannot perform more than one FTE on an annual basis. The number of hours conventionally worked is determined on the basis of normative/ statutory working hours according to the national legislation. \nA full time person will be identified with reference to their employment status and the type of contract (full time or part time).\nThis indicator should not be used to cover research jobs, which should be reported under RCR102.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output of the supported project.","_13_aggregation_issues":"-","_14_reporting":"Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO08","order_by_annex_1":"11","order_by_so":"11","order_by_output_result":"100","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR102","_2_indicator_name":"Research jobs created in supported entities","_2b_indicator_code_and_short":"RCR102 RTDI: New researchers","_3_measurement_unit":"annual FTEs","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of research jobs created as a result of the support. The indicator is measured in terms of average annual full time equivalents (FTEs) calculated according to the methodology provided in the OECD Frascati Manual 2015. Vacant  R&D positions are not counted, neither is support staff for R&D (i.e. posts not directly involved in R&D activities). \nAnnual FTE of R&D personnel is defined as the ratio of working hours actually spent on R&D during a calendar year divided by the total number of hours conventionally worked in the same period by an individual or a group. By convention a person cannot perform more than one FTE on R&D on an annual basis. The number of hours conventionally worked is determined on the basis of normative/ statutory working hours. \nA full time person will be identified with reference to their employment status, the type of contract (full time or part time) and their level of engagement in R&D (see OECD in reference, Chapter 5.3).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"For existing research facilities, upon completion of output of the supported project. For research facilities newly built, one year after completion of the research facility at the latest.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"OECD - Frascati Manual 2015","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO24","order_by_annex_1":"12","order_by_so":"11","order_by_output_result":"109","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR02","_2_indicator_name":"Private investments matching public support (of which: grants, financial instruments)","_2b_indicator_code_and_short":"RCR02 Firms: Private investments","_3_measurement_unit":"euro","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Total private contribution co-financing the supported projects where the form of support is a grant or based on financial instruments. The indicator covers also the non-eligible part of the project cost, also including VAT. For state owned enterprises, the indicator covers the co-financing contributions from their own budget. \nThe indicator should be calculated based on the private co-financing foreseen in the financing agreements. \nIn the case of financial instruments,  it is intended to cover both private financing by the intermediary (fund manager) and the final recipient.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Signature of the grant agreement or decision on FI financial support with the final recipient.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9). Disaggregation of reported data by type of support required only for achieved values.","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"The indicator is to be used for all interventions with private co-financing foreseen in the financing agreement.","_18_link_to_2014_2020_common":"CO06, CO07","order_by_annex_1":"13","order_by_so":"11","order_by_output_result":"101","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR03","_2_indicator_name":"Small and medium-sized enterprises (SMEs) introducing product or process innovation","_2b_indicator_code_and_short":"RCR03 RTDI: SMEs introducing product or process innovation","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of SMEs introducing product or process innovation due to the support provided. The indicator covers also micro enterprises. \nProduct innovation is the market introduction of a new or significantly improved good or service with respect to its capabilities, user friendliness, components or sub-systems. Process innovation is the implementation of a new or significantly improved production process, distribution method, or supporting activity. \nProduct or process innovations must be new to the enterprise supported, but they do not need to be new to the market. The innovations could have been originally developed by the supported enterprises or by other enterprises or organisations.\n (see COM 2014 in references)\nFor enterprise definition - see RCO01.","_11_data_collection":"Supported projects or enterprise surveys","_12_time_measurement_achieved":"At most one year after the completion of output in the supported project.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"COM (2014) - Community Innovation Survey 2014, harmonised survey questionnaire, ESTAT, version 13, 23 July 2014 online","_16_corresponding_corporate":"CCR01","_17_notes":"-","_18_link_to_2014_2020_common":"CO28, CO29","order_by_annex_1":"14","order_by_so":"11","order_by_output_result":"102","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR04","_2_indicator_name":"SMEs introducing marketing or organisational innovation","_2b_indicator_code_and_short":"RCR04 RTDI: SMEs introducing marketing/organisation innovation","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of SMEs introducing marketing or organisational innovation due to the support provided. The indicator covers also micro enterprises. \nMarketing innovation is the implementation of a new marketing concept or strategy that differs significantly from the enterprise's existing marketing methods and which has not been used before. It requires significant changes in product design or packaging, product placement, product promotion or pricing. The indicator does not cover seasonal, regular or other routine changes in marketing methods. \nOrganisational innovation is a new organisational method in the enterprise's business practices (including knowledge management). The organisational innovation must be the result of strategic decisions by the management and implemented with the support of the project. The indicator does not cover mergers or acquisitions. even if for the first time. \n(see COM 2014 in references)\nFor enterprise definition - see RCO01","_11_data_collection":"Supported projects or enterprise surveys","_12_time_measurement_achieved":"At most one year after the completion of output in the supported project.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"COM (2014) - Community Innovation Survey 2014, harmonised survey questionnaire, ESTAT, version 13, 23 July 2014 online","_16_corresponding_corporate":"CCR01","_17_notes":"-","_18_link_to_2014_2020_common":"CO28, CO29","order_by_annex_1":"15","order_by_so":"11","order_by_output_result":"103","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR05","_2_indicator_name":"SMEs innovating in-house","_2b_indicator_code_and_short":"RCR05 RTDI: SMEs innovating in-house","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of enterprises which innovate in-house. The indicator covers also micro enterprises. \nThe innovation activities are carried out in-house by the supported enterprise, and not contracted out to other enterprises or other research organisations. Software development that meets these requirements is included. \n(see COM 2014 in references)\nFor enterprise definition - see RCO01","_11_data_collection":"Supported projects or enterprise surveys","_12_time_measurement_achieved":"At most one year after the completion of output in the supported project.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"COM (2014) - Community Innovation Survey 2014, harmonised survey questionnaire, ESTAT, version 13, 23 July 2014 online","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"16","order_by_so":"11","order_by_output_result":"104","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR06","_2_indicator_name":"Patent applications submitted","_2b_indicator_code_and_short":"RCR06 RTDI: Patent applications submitted","_3_measurement_unit":"patent applications","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of patent applications submitted and validated (“filing”), and which are due to projects supported. The ultimate granting of the application is not a requirement. \nThe supported project should have a clearly identifiable contribution to the patent for which the application is submitted. Design patent applications are included in the indicator RCR07.","_11_data_collection":"Supported projects, patent offices.","_12_time_measurement_achieved":"At most one year after the completion of output in the supported project.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nA patent application is counted once regardless of how many operations contribute to it in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"17","order_by_so":"11","order_by_output_result":"105","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR07","_2_indicator_name":"Trademark and design applications","_2b_indicator_code_and_short":"RCR07 RTDI: Trademark and design applications","_3_measurement_unit":"trademark and design applications","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of EU trademark and Community design applications submitted and validated (“filing”), and which are due to the project supported.  The ultimate granting of the application is not a requirement. \nThe project supported should have clearly identifiable contribution to the trademark or design for which the applications are made. \nTrademark refers to words, symbols or other marks which are used by firms to distinguish their products or services from those offered by others. A European Union trademark application has to be filed and validated at the European Union Intellectual Property Office (EUIPO). \nDesign refers to the \"appearance of the whole or part of a product resulting from the feastures of, in particular, the lines, contours, colours, shape, texture and/ or material of the product itself and/ or its ornamentation.\" The indicator covers applications for registered Community designs (CD). The application for a registered CD has to be filed and validated at the European Union Intellectual Property Office (EUIPO). (see COM 2002 in references)","_11_data_collection":"Supported projects, EUIPO","_12_time_measurement_achieved":"At most one year after completion of output in supported projects","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn application is counted once regardless of how many operations contribute to it in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"COM 2002 - European Council Regulation (EC) no. 6/2002 on Community designs (consolidated version).","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"18","order_by_so":"11","order_by_output_result":"106","_0_erdf":true}
,{"_1_indicator_code":"RCR08","_2_indicator_name":"Publications from supported projects","_2b_indicator_code_and_short":"RCR08 RTDI: Publications from supported projects","_3_measurement_unit":"publications","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe and PO2 Greener Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.1 R&I capacities, RSO1.6 Contributing to strategic technologies, RSO1.7 Defence industrial capacities and capabilities, RSO2.9 Contributing to clean strategic technologies","_9b_indicator_listing_by":"RSO1.1 Enhancing research and innovation","_10_definition_and_concepts":"Number of publications from supported projects. Publications can be in the form or articles, book chapters or books (including co-publications).. The contribution of the supported project should be clearly identifiable. The indicator covers works which have been submitted and accepted for review by peer-review publications.","_11_data_collection":"Supported projects, online sources","_12_time_measurement_achieved":"At most one year after completion of output in the supported project","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nA publication is counted once regardless of how many operations contribute to it in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"19","order_by_so":"11","order_by_output_result":"107","_0_erdf":true}
,{"_1_indicator_code":"RCO13","_2_indicator_name":"Value of digital services, products and processes developed for enterprises","_2b_indicator_code_and_short":"RCO13 Digital: Value of digital services, products and processes","_3_measurement_unit":"euro","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.2 Reaping the benefits of digitisation","_10_definition_and_concepts":"Total value of digital services, products or processes newly developed or significantly upgraded for enterprises through supported projects. Total value can be measured either in terms of market value or in terms of total investments required for the development/ significant upgrade of the respective digital service, product or service. Significant upgrades cover only new functionalities. The digital service/ product/ process may be developed by the enterprise supported or by a contracted third party.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon the completion of output from the supported project.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nA digital service/ product, process is counted once regardless of how many operations contribute to it in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"20","order_by_so":"12","order_by_output_result":"10","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO14","_2_indicator_name":"Public institutions supported to develop digital services, products and processes","_2b_indicator_code_and_short":"RCO14 Digital: Public institutions supported for Digital","_3_measurement_unit":"public institutions","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO1.2 Reaping the benefits of digitisation","_10_definition_and_concepts":"Number of public institutions supported to develop or upgrade significantly digital services, products and processes, for instance in the context of e-government actions. Significant upgrades cover only new functionalities. \nPublic institutions include local public authoritiues, sub-national authorities, or other types of public authorities. The indicator does not cover municipal enterprises and public universities or research institutes.","_11_data_collection":"Supported projects.","_12_time_measurement_achieved":"Upon completion of output from the supported project.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nA public institution is counted once regardless of how manytimes it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO03","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"21","order_by_so":"12","order_by_output_result":"11","_0_erdf":true}
,{"_1_indicator_code":"RCR11","_2_indicator_name":"Users of new and upgraded public digital services, products and processes","_2b_indicator_code_and_short":"RCR11 Digital: Users of new and upgraded public digital services","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.2 Reaping the benefits of digitisation","_10_definition_and_concepts":"Annual number of users of the digital public services, products and processes newly developed or significantly upgraded. Significant upgrades cover only new functionalities.\nThe indicator has a baseline 0 only if the digital service, product or process is new. Users refer to the clients of the public services and products newly developed or upgraded, and to the staff of the public institution using the digital  processes newly developed or significantly upgraded.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"At most one year after completion of output in the supported project.","_13_aggregation_issues":"If individual users cannot be identified, the same client / person using an online service several times over the year is not considered double counting.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR02","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"22","order_by_so":"12","order_by_output_result":"113","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR12","_2_indicator_name":"Users of new and upgraded digital services, products and processes developed by enterprises","_2b_indicator_code_and_short":"RCR12 Digital: Users of digital services by enterprises","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.2 Reaping the benefits of digitisation","_10_definition_and_concepts":"Annual number of users of the digital services, products and processes newly developed or significantly upgraded in the enterprises. Significant upgrades cover only new functionalities. The indicator is used when support is provided to enterprises to develope or upgrade significantly their digital services, products or processes. \nThe indicator has a baseline 0 only if the digital service, product or process is new. Users refer to the clients of the services or products newly developed or upgraded, and to the staff of the enterrpise using the processes newly developed or significantly upgraded.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"At most one year after completion of output in the supported project.","_13_aggregation_issues":"If individual users cannot be identified, the same client person using an online service several times over the year is not considered double counting.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR02","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"23","order_by_so":"12","order_by_output_result":"114","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR13","_2_indicator_name":"Enterprises reaching high digital intensity","_2b_indicator_code_and_short":"RCR13 Digital: Enterprises reaching high digital intensity","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO1.2 Reaping the benefits of digitisation","_10_definition_and_concepts":"Number of supported enterprises reaching high digital intensity as a result of supported projects. \nDigital intensity measures the availability at firm level of 12 different digital technologies as follows: 1) internet for at least 50% of people employed, 2) recourse to ICT specialists, 3) fast broadband (30 Mbps or above), 4) mobile internet devices for at least 20% of people employed, 5) a webpage or homepage, 6) a website with sophisticated functions, 7) social media, 8) paying to advertise on internet, 9) buying medium-high cloud computing services, 10) sending e-invoices suitable for automated processing, 11) e-commerce web sales accounting for at least 1% of total turnover, and 12) business-to-consumer (B2C) web sales of over 10% of total web sales. High digital intensity and above applies to enterprises using at least 7 out of these 12 digital technologies (see DESI 2019 in references).","_11_data_collection":"Supported projects, enterprise survey","_12_time_measurement_achieved":"At most one year after completion of output in the supported project.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"DESI Report 2019 - Integration of Digital Economy, European Commission, DG CONNECT","_16_corresponding_corporate":"-","_17_notes":"The EC definition of Digital intensity changes over time and most probably it will not remain static.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"24","order_by_so":"12","order_by_output_result":"115","_0_erdf":true}
,{"_1_indicator_code":"RCO15","_2_indicator_name":"Capacity of incubation created","_2b_indicator_code_and_short":"RCO15 Firms: Capacity of incubation created","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.3 Growth and competitiveness of SMEs","_10_definition_and_concepts":"Number of enterprises that can be served on a yearly basis by a new business incubator created. For an existing incubator supported to extend its capacity, the indicator measures the additional number of enterprises that can be served on a yearly basis due to the extension of incubation capacity. \nThe indicator covers incubator services which can be provided based on structured relationships documented in the monitoring system. Services expected to be provided on an ad-hoc basis (such as a telephone calls) with potential entrepreneurs are excluded. \nIn case of pre-incubation services, potential entrepreneurs can be considered self-employed persons and therefore proxied as micro enterprises. \nFor more on business incubators see COM 2010 and ECA 2014 in references. \nFor enterprise definition - see RCO01","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon creation of the incubator capacity in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"COM 2010 - The smart guide to innovation-based incubators\nECA 2014 - How the ERDF successfully supported the development of business incubators, Special Report 4/ 14","_16_corresponding_corporate":"-","_17_notes":"The objective with this indicator is to measure new incubation capacity created not the improvement of services in existing incubators.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"25","order_by_so":"13","order_by_output_result":"12","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO103","_2_indicator_name":"High growth enterprises supported","_2b_indicator_code_and_short":"RCO103 Firms: High growth enterprises supported","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO1.3 Growth and competitiveness of SMEs","_10_definition_and_concepts":"Number of high-growth enterprises supported. A high growth enterprise is defined as: 1) an enterprise with an average annualised growth in the number of employees of more than 10% per year over a three year period and at least 10 employees when the growth began, or 2) an enterprise with average annualised growth greater than 20% per year over a three year period. (see ESTAT online in references). \nThe intention is that the enterprises supported meet the definition at the moment the support is decided to be counted under this indicator.\nFor enterprise definition - see RCO01","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"It depends on the type of support: grant (see RCO02), financial instruments (see RCO03) or non-monetary (see RCO04).","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"ESTAT online: Eurostat glossary: High-growth enterprises in Statistics Explained online","_16_corresponding_corporate":"-","_17_notes":"The indicator is meant to be used when the programme targets specifically this type of enterprises with the selection criteria.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"26","order_by_so":"13","order_by_output_result":"75","_0_erdf":true}
,{"_1_indicator_code":"RCR17","_2_indicator_name":"New enterprises surviving in the market","_2b_indicator_code_and_short":"RCR17 Firms: New enterprises surviving in the market","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.3 Growth and competitiveness of SMEs","_10_definition_and_concepts":"The number of new enterprises supported that are still active in the market at least one year after completion of output. The fact that an enterprise is active in the market can be determined, for example, based on the enterprise turnover declared for the fiscal year following the year when output is completed. \nAn enterprise is considered new if it did not exist three years before the enterprise applies for the support provided. An enterprise will not be considered new if only its legal form changes. The indicator covers also spin-offs.\nFor the definition of an enterprise see RCO01.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"End of fiscal year following the year when output is completed.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"27","order_by_so":"13","order_by_output_result":"116","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR18","_2_indicator_name":"SMEs using incubator services after incubator creation","_2b_indicator_code_and_short":"RCR18 Firms: SMEs using incubator services","_3_measurement_unit":"Enterprises/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.3 Growth and competitiveness of SMEs","_10_definition_and_concepts":"Annual number of SMEs using the incubation capacity created with the support. The indicator covers also micro enterprises. For new business incubators, the indicator baseline is 0. For additional incubation capacity, the indicator baseline gives the annual number of enterprises using the incubator services before the intervention. \nThe incubator will report on client entrepreneurs with which it establishes structured relationships documented in the monitoring system. One-off services (such as a telephone calls) with potential entrepreneurs are excluded. \nIn case of pre-incubation services, potential entrepreneurs are considered self-employed persons and therefore proxied as micro enterprises. \nFor more on business incubators see EC 2010 and ECA 2014 in references. \nFor enterprise definition and classification - see RCO01","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of incubator capacity in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"EC 2010 - The smart guide to innovation-based incubators\nECA 2014 - How the ERDF successfully supported the development of business incubators, Special Report 4/ 14","_16_corresponding_corporate":"-","_17_notes":"This indicator is to be used only for interventions aiming at creating new incubation/ additional capacity (measured by RCO15).","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"28","order_by_so":"13","order_by_output_result":"117","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR19","_2_indicator_name":"Enterprises with higher turnover","_2b_indicator_code_and_short":"RCR19 Firms: Enterprises with higher turnover","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO1.3 Growth and competitiveness of SMEs","_10_definition_and_concepts":"Number of enterprises supported to sustain or achieve turnover growth. The indicator counts enterprises for which the annual turnover for the fiscal year after the year of completion of output is at least as high as the annual turnover growth in the year before the project started. For enterprises with no or negative turnover growth before the project started, the turnover growth rate during the fiscal year after the year of output completion should be at least 2%. \nThe enterprise turnover comprises the totals invoiced by the enterprise during the reference period (one year) and it corresponds to market sales of goods and services supplied to third parties (ESTAT2007 in references).","_11_data_collection":"Supported projects, public registries","_12_time_measurement_achieved":"End of fiscal year following the year when output is completed.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"ESTAT2007 - Eurostat-OECD Manual on Business Demography Statistics, 2017 edition","_16_corresponding_corporate":"-","_17_notes":"The indicator is to be used when the objective of the intervention is to sustain or achieve higher turnover growth. \nThe 2% threshold corresponds to the ECB target for the inflation rate.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"29","order_by_so":"13","order_by_output_result":"118","_0_erdf":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR25","_2_indicator_name":"SMEs with higher value added per employee","_2b_indicator_code_and_short":"RCR25 Firms: SMEs with higher value added per employee","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO1.3 Growth and competitiveness of SMEs","_10_definition_and_concepts":"Number of enterprises supported which achieve higher value added per employee. The indicator counts enterprises for which the value added per employee for the fiscal year after the year of completion of output is at least 2% higher than the value added per employee in the year before the project started.","_11_data_collection":"Supported projects, public registries","_12_time_measurement_achieved":"End of fiscal year following the year when output is completed.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective","_15_references":"ESTAT2007 - Eurostat-OECD Manual on Business Demography Statistics, 2017 edition","_16_corresponding_corporate":"-","_17_notes":"The indicator is to be used when the objective of the intervention is to achieve higher values added per employee in the supported SME. The 2% threshold corresponds to the ECB target for the inflation rate.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"30","order_by_so":"13","order_by_output_result":"119","_0_erdf":true}
,{"_1_indicator_code":"RCO16","_2_indicator_name":"Participations of institutional stakeholders in entrepreneurial discovery process","_2b_indicator_code_and_short":"RCO16 RTDI: Stakeholders in entrepreneurial discovery process","_3_measurement_unit":"participations of institutional stakeholders","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.4 Skills for smart specialisation","_9b_indicator_listing_by":"RSO1.4 Skills for smart specialisation and transition","_10_definition_and_concepts":"Number of institutional participantions in stakeholder consultations organised in the framework of smart specialisation strategies for the process of entrepreneurial discovery.  \nIf two or more representatives from the same stakeholder organisation participate in the same meeting, the organisation is to be counted ones. \n(see JRC online in reference)","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"After completion of the consultation activity","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"JRC online: https://s3platform.jrc.ec.europa.eu/entrepreneurial-discovery-edp","_16_corresponding_corporate":"-","_17_notes":"The indicator is to be used to account for participations in stakeholder consultations financed by the programme.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"31","order_by_so":"14","order_by_output_result":"13","_0_erdf":true}
,{"_1_indicator_code":"RCO101","_2_indicator_name":"SMEs investing in skills for smart specialisation, for industrial transition and entrepreneurship","_2b_indicator_code_and_short":"RCO101 RTDI: SMEs investing in new skills","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.4 Skills for smart specialisation and transition","_10_definition_and_concepts":"Number of SMEs supported to invest in skills for smart specialisation, for industrial transition and entrepreneurship. Development of skills for smart specialisation, for industrial transition and entrepreneurship can be achieved, for example, through apprenticeships, structured agreements for job training and experience with suppliers, clients and consultants, continuing vocational education and training, and formal training. \n(see OECD 2013 and ESTAT online in references)","_11_data_collection":"MA monitoring systems","_12_time_measurement_achieved":"Upon completion of the activity for skills development.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"OECD 2013 - Skills development and training in SMEs, local economic and employment development (LEED), OECD Publishing\nESTAT online - Continuing Vocational Training Survey (CVTS) methodology, online in Statistics Explained","_16_corresponding_corporate":"CCO05","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"32","order_by_so":"14","order_by_output_result":"74","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR97","_2_indicator_name":"Apprenticeships supported in SMEs","_2b_indicator_code_and_short":"RCR97 Apprenticeships supported in SMEs","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.4 Skills for smart specialisation and JSO8.1 JTF","_9b_indicator_listing_by":"RSO1.4 Skills for smart specialisation and transition","_10_definition_and_concepts":"People completing an apprenticeship in a domain linked to smart specialisation, industrial transition and entrepreneurship. \n\nApprenticeships are normally part of formal education and training at upper secondary level (ISCED 3), the duration of the training is 2-3 years, and a successful completion leads to a nationally recognised qualification in a specific occupation. The characteristics of the apprenticeship (e.g. occupation, duration, skills to be acquired, wage or allowance) are defined in a training contract or formal agreement between the apprentice and the employer directly or via the education institution.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of the apprenticeship activity,","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"33","order_by_so":"14","order_by_output_result":"164","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR98","_2_indicator_name":"SMEs staff completing training for skills for smart specialisation, for industrial transition and entrepreneurship (by type of skill: technical, management, entrepreneurship, green, other)","_2b_indicator_code_and_short":"RCR98 RTDI: SMEs staff completing training","_3_measurement_unit":"participants","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO1.4 Skills for smart specialisation and transition","_10_definition_and_concepts":"Number of participants from SMEs (including micro enterprises) who complete training/ activity for skills development for smart specialisation, for industrial transition and entrepreneurship. The types of skills include the following categories: \n- Technical skills: skills required for problem solving, design, operation, rethinking and maintenance of machinery or technological structures, IT professional skills;\n- Management skills: skills relating to business planning, complying with regulations and quality control, human resources planning, and allocation of resources;\n- Entrepreneurial skills: specific skills for start-up companies such as risk acceptance/ management, strategic thinking and confidence, the ability to make personal networks, and the ability to deal with challenges and requirements of different nature;\n- Green skills: specific skills to modify products, services or operations due to climate change adjustments, environmental protection, circular economy, resource efficiency and requirements or regulations;\n- Other skills: skills other than the four types described above.\n\n(OECD 2013 in references)","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of activity for skills development","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9). Disaggregation by type of skills reported only for achieved values.","_15_references":"OECD 2013 - Skills development and training in SMEs, local economic and employment development (LEED), OECD publishing","_16_corresponding_corporate":"CCR04","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"34","order_by_so":"14","order_by_output_result":"165","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO41","_2_indicator_name":"Additional dwellings with broadband access of very high capacity","_2b_indicator_code_and_short":"RCO41 Digital: Add. dwellings with broadband of v high capacity","_3_measurement_unit":"dwellings","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.5 Digital Connectivity","_9b_indicator_listing_by":"RSO1.5 Digital Connectivity","_10_definition_and_concepts":"Total number of dwellings with broadband access of very high capacity due to the supported projects. \nThe indicator does not count collective dwellings such as hospitals, old peoples' homes, residential homes, prisons, military barracks, religious institutions, boarding houses, workers' hostels etc.\nArticle 2(2) of the  European Electronic Communications Code (EECC) currently defines the term ‘very high capacity network’ as follows: “Very high capacity network’ means either an electronic communications network which consists wholly of optical fibre elements at least up to the distribution point at the serving location, or an electronic communications network which is capable of delivering, under usual peak-time conditions, similar network performance in terms of available downlink and uplink bandwidth, resilience, error-related parameters, and latency and its variation”. \nThe definition is further clarified in Recital 13 of the EECC:\n“[…] future ‘very high capacity networks’ require performance parameters which are equivalent to those that a network based on optical fibre elements at least up to the distribution point at the serving location can deliver. In the case of fixed-line connection, this corresponds to network performance equivalent to that achievable by an optical fibre installation up to a multi-dwelling building, considered to be the serving location. In the case of wireless connection, this corresponds to network performance similar to that achievable based on an optical fibre installation up to the base station, considered to be the serving location.”\nThe BEREC Guidelines on Very High Capacity Networks (see References) provides guidance on the criteria a network has to fulfil to be considered a very high capacity network according to the EECC definition.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive (EU) 2018/1972 of the European Parliament and of the Council establishing the European Electronic Communication Code\nBEREC Guidelines on Very High Capacity Networks (BoR (20) 165, adopted on 1.10.2020).","_16_corresponding_corporate":"CCO13","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"35","order_by_so":"15","order_by_output_result":"32","_0_erdf":true}
,{"_1_indicator_code":"RCO42","_2_indicator_name":"Additional enterprises with broadband access of very high capacity","_2b_indicator_code_and_short":"RCO42 Digital: Add enterprises with broadband of VHC","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.5 Digital Connectivity","_9b_indicator_listing_by":"RSO1.5 Digital Connectivity","_10_definition_and_concepts":"Total number of local units of enterprises with broadband access of very high capacity due to the supported projects. \nFor the definition of \"Very high capacity\" see indicator RCO41.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive (EU) 2018/1972 of the European Parliament and of the Council establishing the European Electronic Communication Code\nBEREC Guidelines on Very High Capacity Networks (BoR (20) 165, adopted on 1.10.2020).","_16_corresponding_corporate":"CCO13","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"36","order_by_so":"15","order_by_output_result":"33","_0_erdf":true}
,{"_1_indicator_code":"RCR53","_2_indicator_name":"Dwellings with broadband subscriptions to a very high capacity network","_2b_indicator_code_and_short":"RCR53 Digital: Dwellings with broadband to vhc network","_3_measurement_unit":"dwellings","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.5 Digital Connectivity","_9b_indicator_listing_by":"RSO1.5 Digital Connectivity","_10_definition_and_concepts":"Additional dwellings with broadband subscriptions to a very high capacity network as a result of the supported projects. \nFor the definition of \"Very high capacity\" see indicator RCO41.","_11_data_collection":"Suported projects, surveys of dwellings in areas covered by the intervention","_12_time_measurement_achieved":"One year after the completion of output in supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Directive (EU) 2018/1972 of the European Parliament and of the Council establishing the European Electronic Communication Code\nBEREC Guidelines on Very High Capacity Networks (BoR (20) 165, adopted on 1.10.2020).","_16_corresponding_corporate":"CCR12","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"37","order_by_so":"15","order_by_output_result":"137","_0_erdf":true}
,{"_1_indicator_code":"RCR54","_2_indicator_name":"Enterprises with broadband subscriptions to a very high capacity network","_2b_indicator_code_and_short":"RCR54 Digital: Enterprises with broadband to vhc network","_3_measurement_unit":"enterprises","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe","_8b_po_igj_original":"PO1","_9_indicator_usage_by_specific":"RSO1.5 Digital Connectivity","_9b_indicator_listing_by":"RSO1.5 Digital Connectivity","_10_definition_and_concepts":"Additional local units of enterprises with broadband subscriptions to a very high capacity network as a result of the supported projects. \nFor the definition of \"Very high capacity\" see indicator RCO41.","_11_data_collection":"Supported projects, surveys of enterprises in the area covered by the intervention","_12_time_measurement_achieved":"One year after the completion of output in supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Directive (EU) 2018/1972 of the European Parliament and of the Council establishing the European Electronic Communication Code\nBEREC Guidelines on Very High Capacity Networks (BoR (20) 165, adopted on 1.10.2020).","_16_corresponding_corporate":"CCR12","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"38","order_by_so":"15","order_by_output_result":"138","_0_erdf":true}
,{"_1_indicator_code":"RCO18","_2_indicator_name":"Affordable and sustainable dwellings with improved energy performance","_2b_indicator_code_and_short":"RCO18 Energy: Dwellings with improved energy performance","_3_measurement_unit":"dwellings","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe, PO4 Social Europe, PO5 Europe closer to citizens and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.1 Energy efficiency, RSO2.11 Affordable housing, RSO4.7 Affordable housing, RSO5.3 Affordable housing and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"Number of dwellings with improved energy performance due to the financial support provided. Improved energy performance is to be understood in terms of an improvement in the energy classification of the dwelling by at least one energy class, and it is to be documented based on energy performance certificates (EPC). The energy classification considered follows the definition in the national Energy Performance Certificate, in line with the Directive 2010/31/EU. \nA dwelling is defined as \"a room or a suite of rooms in a permanent building or a structurally separated part of a building which (...) is designed for habitation of one private household all year around.\" (see ESTAT online in references). The indicator covers also social housing under RSO2.1, RSO2.11, RSO4.7 and RSO5.3, in which case RCO65 - Social Infra: Capacity of new or modernised social housing - should also be used.\nThis indicator does not cover dwellings covered by RCO123 Energy: Dwellings with replacement gas-fired boilers, in order to avoid the need for operations supported to use two energy performance indicators.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output and issuance of the energy performance certificate.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"ESTAT online - Housing Statistics, in Statistics Explained\nDirective 2010/31/EU of the European Parliament and the Council on the energy performance of buildings.\nDirective (EU) 2018/844 of the European Parliament and of the Council of 30 May 2018 amending Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency (OJ L 156/75, 19.6.2018)","_16_corresponding_corporate":"-","_17_notes":"The name of the indicator was changed in 2025, with the amendment of Regulations (EU) 2021/1058 and (EU) 2021/1056 in the context of the mid-term review, to give visibility to already existing related regulatory requirements (EPBD and CPR) and to highlight the fact that energy efficiency measures decrease the energy bills of households, therefore making housing more affordable.","_18_link_to_2014_2020_common":"CO31","order_by_annex_1":"39","order_by_so":"21","order_by_output_result":"14","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true","edited_by_swd_2025_346":"MODIFIED"}
,{"_1_indicator_code":"RCO19","_2_indicator_name":"Public buildings with improved energy performance","_2b_indicator_code_and_short":"RCO19 Energy: Public buildings with improved energy performance","_3_measurement_unit":"square metres","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.1 Energy efficiency and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"Net floor area of public buildings which achieve better energy performance due to the support received. Improved energy performance is to be understood in terms of an improvement in the energy classification of the public building by at least one energy class, and it is to be documented based on energy performance certificates (EPC). The energy classification considered follows the definition in the national Energy Performance Certificate, in line with the Directive 2010/31/EU. \nPublic buildings are defined as buildings owned by public authorities and buildings owned by a non-profit organisation. A non-profit organisation is a legal entity organised and operated for a collective, public or social benefit, in contrast with an entity that operates as a business aiming to generate a profit for its owners. Examples include building for public administration, schools, hospitals etc. \nThe indicator does not cover \n-  social housing (as this is included in RCO18).\n-  private schools or private hospitals that are owned by private investors. Support to such private entities should be reported as support to enterprises using RCO01, etc.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output and issuance of the energy performance certificate.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2010/31/EU of the European Parliament and the Council on the energy performance of buildings.\nDirective (EU) 2018/844 of the European Parliament and of the Council of 30 May 2018 amending Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency (OJ L 156/75, 19.6.2018)","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"new","order_by_annex_1":"40","order_by_so":"21","order_by_output_result":"15","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO20","_2_indicator_name":"District heating and cooling network lines newly constructed and improved","_2b_indicator_code_and_short":"RCO20 Energy: District heating and cooling network lines","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.1 Energy efficiency and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"Length of district heating and cooling network lines newly constructed or improved in terms of energy performance. Improved energy performance refers to the efficiency of the heating and cooling network lines as documented by the technical specifications for the network lines which are being modernised or newly built. \nFor further technical details on energy efficiency of district heating and cooling networks see Directive 2012/27/EU in references.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nIf the same network line is financed by multiple forms of support (ex: grants and financial instruments) in the same specific objective, it should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2012/27/EU of the European Parliament and the Council on energy efficiency.","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"new","order_by_annex_1":"41","order_by_so":"21","order_by_output_result":"16","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO104","_2_indicator_name":"Number of high efficiency co-generation units","_2b_indicator_code_and_short":"RCO104 Energy: Number of high efficiency co-generation units","_3_measurement_unit":"co-generation units","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.1 Energy efficiency and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"Number of high efficiency cogeneration units supported. High efficiency cogeneration is defined by the energy savings obtained by combined production instead of separate production of heat and electricity. Energy savings of more than 10% qualify for the term ‘high-efficiency cogeneration’.  (Directive 2004/8/EC in references)","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon competion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2004/8/EC of the European Parliament and of the Council on the promotion of cogeneration based on a useful heat demand in the internal energy market and ameding Directive 92/42/EEC","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"new","order_by_annex_1":"42","order_by_so":"21","order_by_output_result":"76","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO123","_2_indicator_name":"Dwellings benefitting from natural gas-fired boilers and heating systems replacing solid fossil fuels based installations","_2b_indicator_code_and_short":"RCO123 Energy: Dwellings with replacement gas-fired boilers","_3_measurement_unit":"dwellings","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.1 Energy Efficiency","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"This indicator specifically measures the number of  dwellings supported to benefit from natural gas-fired boilers and heating systems replacing solid fossil fuels based installations.\nThe dwellings benefitting from new natural gas fired biolers should achieve improved energy performance due to the financial support provided. Improved energy performance is to be understood in terms of an improvement in the energy classification of the dwelling by at least one energy class, and it is to be documented based on energy performance certificates (EPC). The energy classification considered follows the definition in the national Energy Performance Certificate, in line with the Directive 2010/31/EU.\nA dwelling is defined as \"a room or a suite of rooms in a permanent building or a structurally separated part of a building which (...) is designed for habitation of one private household all year around.\" (see ESTAT online in references). The indicator covers also social housing.\nThe dwellings counted under this indicator shall not be counted under RCO18 Energy: Dwellings with improved energy peformance, in order to avoid the need for operations supported to use two energy performance indicators.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"43","order_by_so":"21","order_by_output_result":"96","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR26","_2_indicator_name":"Annual primary energy consumption (of which: dwellings, public buildings, enterprises, other)","_2b_indicator_code_and_short":"RCR26 Energy: Annual primary energy consumption","_3_measurement_unit":"MWh/year","_4_type_of_indicator":"result","_5_baseline":">0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe, PO4 Social Europe, PO5 Europe closer to citizens and JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.1 Energy efficiency, RSO2.11 Affordable housing, RSO4.7 Affordable housing, RSO5.3 Affordable housing and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"Total annual primary energy consumption for supported entities. The baseline refers to the annual primary energy consumption before the intervention, and the achieved value refers to the annual primary energy consumption for the year after the intervention. For buildings, both values are to be documented based on energy performance certificates, in line with the Directive 2010/31/EU. For processes in enterprises, the annual primary energy consumption is to be documented based on energy audits or other relevant technical specifications. \nPublic buildings are defined as buildings owned by public authorities and buildings owned by a non-profit organisation, provided that such bodies pursue objectives of general interest such as education, health, environment and transport. Examples include building for public administration, schools, hospitals etc.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output and issuance of the energy performance certificate, energy audit or other relevant technical specification.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9). Disagregation by type of entities supported is to be reported only for achieved values.","_15_references":"Directive 2010/31/EU of the European Parliament and the Council on the energy performance of buildings.\nDirective (EU) 2018/844 of the European Parliament and of the Council of 30 May 2018 amending Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency (OJ L 156/75, 19.6.2018)","_16_corresponding_corporate":"CCR05","_17_notes":"-","_18_link_to_2014_2020_common":"CO32","order_by_annex_1":"44","order_by_so":"21","order_by_output_result":"120","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR29","_2_indicator_name":"Estimated greenhouse emissions","_2b_indicator_code_and_short":"RCR29 Climate: Estimated GHG emissions","_3_measurement_unit":"tonnes CO2 eq./year","_4_type_of_indicator":"result","_5_baseline":">0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"Total estimated GHG emissions for the entities or processes supported. The baseline refers to the level of estimated GHG emissions during the year before the intervention starts, and the achieved value is calculated as the total estimated GHG emissions based on the achieved level of energy performance during the year after the completion of the intervention.\n\nThis indicator shall not be used in operations using the indicators “RCR105 Estimated GHG emissions by boilers converted to gas” or “RCR29a JTF: Est. GHG emissions in enterprises (Dir. 2003/87/EC)”, in order to avoid the need for operations supported to use two GHG indicators.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of the intervention and availability of energy performance certificates, energy audits or other relevant technical specifications.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"The indicator is to be used when the objective of the intervention is to reduce GHG emissions.\nFor further clarification on methodologies available see the proceedings of the joint REGIO Evalnet / EIB seminar of November 2020 here: https://ec.europa.eu/regional_policy/en/policy/evaluations/guidance/#1","_18_link_to_2014_2020_common":"CO34","order_by_annex_1":"45","order_by_so":"21","order_by_output_result":"121","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR105","_2_indicator_name":"Estimated greenhouse emissions by boilers and heating systems converted from solid fossil fuels to gas","_2b_indicator_code_and_short":"RCR105 Estimated GHG emissions by boilers converted to gas","_3_measurement_unit":"tonnes CO2 eq./year","_4_type_of_indicator":"result","_5_baseline":">0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.1 Energy Efficiency","_9b_indicator_listing_by":"RSO2.1 Energy Efficiency","_10_definition_and_concepts":"Total estimated GHG emissions in the case of support to boilers and heating systems converted from solid fossil fuels to gas. The baseline refers to the level of estimated GHG emissions during the year before the intervention starts, and the achieved value is calculated as the total estimated GHG emissions based on the achieved level of energy performance during the year after the completion of the intervention.\nThe values reported under this indicator shall not be reported under  “RCR29 Climate: Estimated greenhouse emissions”, in order to avoid the need for operations supported to use two GHG indicators.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output and issuance of the energy performance certificate.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"For further clarification on methodologies available see the proceedings of the joint REGIO Evalnet / EIB seminar of November 2020 here: https://ec.europa.eu/regional_policy/en/policy/evaluations/guidance/#1","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"46","order_by_so":"21","order_by_output_result":"112","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO22","_2_indicator_name":"Additional production capacity for renewable energy (of which: electricity, thermal)","_2b_indicator_code_and_short":"RCO22 Energy: Renewable energy capacity","_3_measurement_unit":"MW","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO2.2 Renewable energy","_10_definition_and_concepts":"Additional production capacity for renewable energy built or extended due to the support. The indicator also covers production capacity that has been built or extended and is not yet connected to the grid (if applicable) or not yet fully ready to produce energy.  \nProduction capacity is understood as the “net maximum electrical capacity”, defined by Eurostat as “the maximum active power that can be supplied, continuously, with all plant running, at the point of outlet (i.e. after taking the power supplies for the station auxiliaries and allowing for the losses in those transformers considered integral to the station)”.. \nRenewable energy means \"energy from renewable non-fossil sources namely wind, solar (thermal and photovoltaic) and geothermal energy, ambient energy, tide, wave and other ocean energy, hydropower, biomass, landfill gas, sewage treatment plant gas, and biogas.\" (see Directive 2018/2011).\nThe disaggregation of capacity in electricity and thermal refers to the type of energy produced.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output from the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nIf the capacity is financed by multiple forms of support (ex: grants and financial instruments) in the same specific objective, it should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5). Disaggregation by source of energy is to be reported only for achieved values.","_15_references":"Directive 2018/2001 of the European Parliament and the Council on the promotion of the use of energy from renewable sources","_16_corresponding_corporate":"CCO07","_17_notes":"-","_18_link_to_2014_2020_common":"CO30","order_by_annex_1":"47","order_by_so":"22","order_by_output_result":"17","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO97","_2_indicator_name":"Renewable energy communities supported","_2b_indicator_code_and_short":"RCO97 Energy: Renewable energy communities supported","_3_measurement_unit":"renewable energy communities","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO2.2 Renewable energy","_10_definition_and_concepts":"Number of renewable energy communities supported. A renewable energy community means a legal entity which fulfills the following three conditions:\na) is based on open and voluntary participation, is autonomous and effectively controlled by shareholders or members that are located in the proximity of the renewable energy projects that are owned and developed by that legal entity;\nb) its shareholders or members are natural persons, SMEs or local authorities, including municipalities;\nc) its primary purpose is to provide environmental, economic or social community benefits for its shareholders or members or for the local areas where it operates, rather than financial profits. \n(see Directive 2018/2001 in references)\nFor the definition of renewable energy see RCO22.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output from the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nIf the capacity is financed by multiple forms of support (ex: grants and financial instruments) in the same specific objective, it should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2018/2001 of the European Parliament and the Council on the promotion of the use of energy from renewable sources","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"48","order_by_so":"22","order_by_output_result":"73","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR31","_2_indicator_name":"Total renewable energy produced (of which: electricity, thermal)","_2b_indicator_code_and_short":"RCR31 Energy: Total renewable energy produced","_3_measurement_unit":"MWh/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO2.2 Renewable energy","_10_definition_and_concepts":"Annual renewable energy produced before and after the intervention in supported projects. The baseline refers to the annual energy produced in the year before the intervention starts, and it can be non-zero in cases where production capacity is extended. The achieved value is the annual energy produced in the year after the intervention is completed. The disaggregation by electricity and thermal refers to the source of the renewable energy. \nFor the definition of renewable energy see RCO22.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of the output in the supported project.","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nIf the capacity is financed by multiple forms of support (ex: grants and financial instruments) in the same specific objective, it should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9). Disaggregation in electricity and thermal is to be reported only for achieved values.","_15_references":"-","_16_corresponding_corporate":"CCR06","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"49","order_by_so":"22","order_by_output_result":"123","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR32","_2_indicator_name":"Additional operational capacity installed for renewable energy","_2b_indicator_code_and_short":"RCR32 Energy: Renewable energy capacity","_3_measurement_unit":"MW","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO2.2 Renewable energy","_10_definition_and_concepts":"Additional capacity installed for renewable energy due to the support provided, and which is operational (i.e. connected to the grid (if applicable) and fully ready to produce or already producing energy). \nProduction capacity is understood as the “net maximum electrical capacity”, defined by Eurostat as “the maximum active power that can be supplied, continuously, with all plant running, at the point of outlet (i.e. after taking the power supplies for the station auxiliaries and allowing for the losses in those transformers considered integral to the station)”.\nFor the definition of renewable energy see RCO22.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"As soon as the production capacity is operational (i.e. ready to produce or already producing energy).","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nIf the capacity is financed by multiple forms of support (ex: grants and financial instruments) in the same specific objective, it should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"50","order_by_so":"22","order_by_output_result":"124","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO23","_2_indicator_name":"Digital management systems for smart energy systems","_2b_indicator_code_and_short":"RCO23 Energy: Digital management for smart energy systems","_3_measurement_unit":"system components","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.3 Smart energy systems","_9b_indicator_listing_by":"RSO2.3 Smart energy systems","_10_definition_and_concepts":"The number of electricity distribution system components created, installed or significantly upgraded for smart energy management by digital management systems. created or upgraded significantly for smart energy systems. \nComponents may include installation of remote sensoring equipment and controls in distribution nodes, substations, data management systems and structures (e.g data hubs).  \nSmart energy systems, including smart electricity distribution grids and smart heat networks, refer to integration in a cost efficient manner of the behaviour and actions of all users connected in order to ensure an economically efficient and sustainable power system with low losses and high levels of quality, security of supply and safety.\n Electricity distribution refers to the \"final mile\" in the delivery of electricity, the link between the transmission system and electricity consumers. Significant upgrading refers to new functionalities of the digital management system.\n(see Directive 2019/944 and Regulation 347/2013 in references)","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nIf the same system component is financed by several projects in the same specific objective, it should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 5).","_15_references":"DIRECTIVE (EU) 2019/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market for electricity and amending Directive 2012/27/EU\nRegulation (EU) 347/2013 of the European Parliament and of the Council on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulation (EC) No 714/2009 and (EC) No 715/2009","_16_corresponding_corporate":"CCO08","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"51","order_by_so":"23","order_by_output_result":"18","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO105","_2_indicator_name":"Solutions for electricity storage","_2b_indicator_code_and_short":"RCO105 Energy: Solutions for electricity storage","_3_measurement_unit":"MWh","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.3 Smart energy systems, RSO2.12 Energy interconnectors and recharging infrastructure","_9b_indicator_listing_by":"RSO2.3 Smart energy systems","_10_definition_and_concepts":"Storage capacity for electricity created or expanded due to the support provided.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"52","order_by_so":"23","order_by_output_result":"77","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO124","_2_indicator_name":"Gas transmission and distribution network lines newly constructed or improved","_2b_indicator_code_and_short":"RCO124 Energy: Gas transmission and distribution network lines","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.3 Smart energy systems","_9b_indicator_listing_by":"RSO2.3 Smart energy systems","_10_definition_and_concepts":"Total length of gas transmission and distribution network, new, reconstructed or modernised due to the supported projects. \nThe indicator does not cover interventions for gas storage or for digital management components (use RCO23 Energy: Digital management for smart energy systems)\nMaintenance and repair are excluded.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"53","order_by_so":"23","order_by_output_result":"97","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR33","_2_indicator_name":"Users connected to smart energy systems","_2b_indicator_code_and_short":"RCR33 Energy: Users connected to smart energy systems","_3_measurement_unit":"end users/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.3 Smart energy systems","_9b_indicator_listing_by":"RSO2.3 Smart energy systems","_10_definition_and_concepts":"Annual end users connected to smart energy systems, including smart electricity distribution and smart heat grids supported by the projects. End users may include private and collective households, enterprises etc. For an existing energy system which is upgraded/ expanded, the baseline refers to the number of annual users in the year before the intervention starts, and the achieved value is the number of annual users in the year following the completion of the physical investment. For an energy system newly created with the project supported, the baseline is 0. \nFor smart energy systems see indicator RCO23.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of the output in the supported projects.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR07","_17_notes":"-","_18_link_to_2014_2020_common":"CO33","order_by_annex_1":"54","order_by_so":"23","order_by_output_result":"125","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR34","_2_indicator_name":"Roll-out of projects for smart energy systems","_2b_indicator_code_and_short":"RCR34 Energy: Roll-out of projects for smart energy systems","_3_measurement_unit":"projects","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.3 Smart energy systems","_9b_indicator_listing_by":"RSO2.3 Smart energy systems","_10_definition_and_concepts":"The number of projects for smart energy systems which are created with the project supported and which are rolled out in other areas or upscaled during the first year after the completion of the intervention. In order to count as achieved value, the upscaling of the project needs to start effectively during the year after the completion of output, but not necessarily completed.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of the output in the supported projects.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"55","order_by_so":"23","order_by_output_result":"126","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO24","_2_indicator_name":"Investments in new or upgraded disaster monitoring, preparedness, warning and response systems against natural disasters","_2b_indicator_code_and_short":"RCO24 Climate: Investments in disaster management","_3_measurement_unit":"euro","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Total value of investments in projects supporting the development or upgrading of disaster monitoring, preparedness, warning and response systems linked to climate related natural risks. Upgrading should refer primarily to new functionalities or to upscaling of existing systems at national and regional levels. The indicator covers also cross-border and transnational investments in such measures / actions. \nThe indicator covers interventions at national and regional level which are not disaster specific or which are not covered by the related common indicators for floods (RCO25, RCO105) or, wildfires (RCO28).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO09","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"56","order_by_so":"24","order_by_output_result":"19","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO122","_2_indicator_name":"Investments in new or upgraded disaster monitoring, preparedness, warning and response systems against non-climate related natural risks and risks related to human activities","_2b_indicator_code_and_short":"RCO122 Investments in disaster management (non climate)","_3_measurement_unit":"euro","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Total value of investments in projects supporting the development or upgrading of disaster monitoring, preparedness, warning and response systems focussed on non-climate related natural risks (i.e. volcanic or geological risks) and risks related to human activities. Upgrading should refer primarily to new functionalities or to upscaling of existing systems at national and regional levels. The indicator covers also cross-border and transnational investments in such measures / actions. \nThe indicator covers interventions at national and regional level which are not disaster specific or which are not covered by the related common indicators for natural disaster monitoring (RCO24), floods (RCO25, RCO105) or wildfires (RCO28).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO09","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"57","order_by_so":"24","order_by_output_result":"95","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO25","_2_indicator_name":"Coastal strip, river bank and lakeshore flood protection newly built or consolidated","_2b_indicator_code_and_short":"RCO25 Climate: Flood protection newly built or consolidated","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Length of coastal strip, riverbanks, and lakeshore protected against extreme weather events. Protection infrastructure supported should be newly built or consolidated significantly.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"58","order_by_so":"24","order_by_output_result":"20","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO106","_2_indicator_name":"Landslide protection newly built or consolidated","_2b_indicator_code_and_short":"RCO106 Climate: Landslide protection","_3_measurement_unit":"hectares","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Surface area of landslide protection newly built or consolidated significantly through the supported projects. \nSurface area shall be understood as the estimated surface of the slope or cliff protected (taking into account the vertical dimension) and not solely the 2 dimensional projection of the surface at ground level.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"59","order_by_so":"24","order_by_output_result":"78","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO26","_2_indicator_name":"Green infrastructure built or upgraded for adaptation to climate change","_2b_indicator_code_and_short":"RCO26 Climate: Green infrastructure adaptated to climate change","_3_measurement_unit":"hectares","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Area of green infrastructure newly built or upgraded significantly in order to enhance adaptation to climate change, for instance by strengthening protection to floods and preventing soil erosion. Green infrastructure typically refers to trees, lawns, hedgerows, parks, fields, forests, etc. The indicator also covers blue infrastructure such as water elements, like rivers, canals, ponds, wetlands, floodplains, water treatment facilities, etc.\n(see Naumann et all (2011) in references)","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Neumann et all. (2011) - Assessment of the potential of ecosystem-based approaches to climate change adaptation and mitigation in Europe, study financed by the European Commission, available online. \nFor definition see https://ec.europa.eu/environment/nature/ecosystems/index_en.htm  \nhttps://ec.europa.eu/transparency/regdoc/rep/10102/2019/EN/SWD-2019-193-F1-EN-MAIN-PART-1.PDF","_16_corresponding_corporate":"-","_17_notes":"This indicator is meant to be used if the main objective with the new or upgraded green infrastructure is adaptation to climate change.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"60","order_by_so":"24","order_by_output_result":"21","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO27","_2_indicator_name":"National and sub-national strategies addressing climate change adaptation","_2b_indicator_code_and_short":"RCO27 Climate: Strategies addressing climate change adaptation","_3_measurement_unit":"strategies","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Number of national and sub-national (regional or local) strategies addressing climate change adaptation for which the costs are financed by the supported projects. The indicator covers strategies that are adopted. The indicator covers also strategies for water management.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nIf the same strategy is financed by several projects in the same specific objective, it should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"61","order_by_so":"24","order_by_output_result":"22","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO28","_2_indicator_name":"Area covered by protection measures against wildfires","_2b_indicator_code_and_short":"RCO28 Climate: Area covered by protection against wildfires","_3_measurement_unit":"hectares","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Surface area covered by protection measures against wildfires developed or significantly upgraded through supported projects. Significant upgrades refer, for example, to new functionalities for protection or upscaling of existing protection measures.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In order to prevent an overlap with indicator RCO26 (green infrastructure), afforestation measures are not included in RCO28 for protection measures against wildfires.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"62","order_by_so":"24","order_by_output_result":"23","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR35","_2_indicator_name":"Population benefiting from flood protection measures","_2b_indicator_code_and_short":"RCR35 Climate: Population benefiting from flood protection","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Population living in areas where protection infrastructure (including also green infrastructure for adaptation to climate change) is built or signficantly upgraded in order to reduce vulnerability to flood risks. The indicator counts the resident population at risk of flooding.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nPopulation in a given area should be counted once even if covered by several projects financed in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR08","_17_notes":"-","_18_link_to_2014_2020_common":"CO20","order_by_annex_1":"63","order_by_so":"24","order_by_output_result":"127","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR36","_2_indicator_name":"Population benefiting from wildfire protection measures","_2b_indicator_code_and_short":"RCR36 Climate: Pop. benefiting from wildfire protection","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Population living in areas exposed to widlfire risks and where vulnerability to wildfires decreases as a result of the supported projects. The indicator covers protection measures which are clearly localised in high risk areas and which address directly wildfires risks, as opposed to more general measures implemented at national or regional level.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nPopulation in a given area should be counted once even if covered by several projects financed in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR08","_17_notes":"-","_18_link_to_2014_2020_common":"CO21","order_by_annex_1":"64","order_by_so":"24","order_by_output_result":"128","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR37","_2_indicator_name":"Population benefiting from protection measures against climate related natural disaster (other than flood and wildfires)","_2b_indicator_code_and_short":"RCR37 Climate: Pop protected from natural disaster (climate)","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Population living in areas exposed to climate related natural risks, other than floods and wildfires (storms, droughts, heatwaves), and where vulnerability to such risks decreases as a result of the supported projects. The indicator covers protection measures, areas at risk and which address directly the specific risks, as opposed to more general measures implemented at national or regional level.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nPopulation in a given area should be counted once even if covered by several projects financed in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR08","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"65","order_by_so":"24","order_by_output_result":"129","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR96","_2_indicator_name":"Population benefiting from protection measures against non-climate related natural risks and risks related to human activities","_2b_indicator_code_and_short":"RCR96 Env: Pop protected against natural risks (non climate)","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Population living in areas exposed to non-climate related natural risks and risks related to human activities, and where vulnerability to such risks decreases as a result of the supported projects. The indicator covers protection measures which are clearly localised in high risk areas and which address directly the specific risks, as opposed to more general measures implemented at national or regional level.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nPopulation in a given area should be counted once even if covered by several projects financed in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"66","order_by_so":"24","order_by_output_result":"163","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO121","_2_indicator_name":"Area covered by protection measures against climate related natural disasters (other than floods and wildfire)","_2b_indicator_code_and_short":"RCO121 Climate: Area covered by protection measures (other)","_3_measurement_unit":"hectares","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.4 Climate change adaptation","_9b_indicator_listing_by":"RSO2.4 Climate change adaptation","_10_definition_and_concepts":"Surface area covered by protection measures against climate related risks (other than floods and wildfires) developed or significantly upgraded through supported projects (i.e. measures related to drought prevention or against the effects of excessive heat). Significant upgrades refer, for example, to new functionalities for protection or upscaling of existing protection measures.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"67","order_by_so":"24","order_by_output_result":"93","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO30","_2_indicator_name":"Length of new or upgraded pipes for the distribution systems of public water supply","_2b_indicator_code_and_short":"RCO30 Water: Length of pipes for public water supply","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.5 Sustainable water","_9b_indicator_listing_by":"RSO2.5 Sustainable water","_10_definition_and_concepts":"The length of new or upgraded pipes for the distribution of public water supplied. Upgrading refers to significant improvements aiming at higher quality of water and/or reduction of water losses. The water pipes need to be physically completed in order to count for the achieved values.\nMaintenance and repairs are not covered.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"68","order_by_so":"25","order_by_output_result":"24","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO31","_2_indicator_name":"Length of new or upgraded pipes for the public network for collection of waste water","_2b_indicator_code_and_short":"RCO31 Water: Length of pipes for collection of waste water","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.5 Sustainable water","_9b_indicator_listing_by":"RSO2.5 Sustainable water","_10_definition_and_concepts":"Length of new or upgraded pipes for the public network for waste water collection.  Upgrading refers to significant improvements aiming elimination of leakages etc. The waste water pipes need to be physically complete in order to count for the achieved values.  \nThe indicator also covers waste water collection network linked to storm water management. \n(see Council Directive 191/271/EC in references)\nMaintenance and repairs are not covered.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Council Directive 91/271/EC concerning urban waste water treatment","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"69","order_by_so":"25","order_by_output_result":"25","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO32","_2_indicator_name":"New or upgraded capacity for waste water treatment","_2b_indicator_code_and_short":"RCO32 Water: New or upgraded capacity for waste water treatment","_3_measurement_unit":"population equivalent","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.5 Sustainable water","_9b_indicator_listing_by":"RSO2.5 Sustainable water","_10_definition_and_concepts":"Additional capacity for waste water treatment newly installed or upgraded through the supported projects. Upgraded capacity refers to significant improvements in the waste water treatment method (example: from primary to secondary treatment). \nPopulation equivalent (1 p.e.) is defined as the organic biodegradable load having a five-day biochemical oxygen demand (BOD) of 60 g oxygen per day. (See Council Directive 91/271/EC in references)","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Council Directive 19/271/EC concerning urban waste water treatment","_16_corresponding_corporate":"CCO10","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"70","order_by_so":"25","order_by_output_result":"26","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR41","_2_indicator_name":"Population connected to improved public water supply","_2b_indicator_code_and_short":"RCR41 Water: Population with improved water supply","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.5 Sustainable water","_9b_indicator_listing_by":"RSO2.5 Sustainable water","_10_definition_and_concepts":"Population connected to improved public water supply as a result of the implemented project. Improved water supply is interpreted in terms of access (i.e. new connections to the public water supply), higher volume of water delivered to consumers, reduction of water losses, and better quality of water. \nThe EU standard for the quality of drinking water is defined in Council Directive 98/93/EC (see references).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"At latest one year after the completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective.\nPopulation in a given area should be counted once even if covered by several projects financed in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Council Directive 98/83/EC on the quality of water intended for human consumption.","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO18","order_by_annex_1":"71","order_by_so":"25","order_by_output_result":"130","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR42","_2_indicator_name":"Population connected to at least secondary public waste water treatment","_2b_indicator_code_and_short":"RCR42 Water: Pop. connected to secondary waste water treatment","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.5 Sustainable water","_9b_indicator_listing_by":"RSO2.5 Sustainable water","_10_definition_and_concepts":"Additional population connected to at least secondary public waste water treatment as a result of the supported projects (treatment plants and netwok extension). Secondary waste water treatment refers to the treatment of urban waste water by a process generally involving biological treatment in line with the terms of Directive 91/271/EC (see references). The indicator can be also used by projects supporting the extension of the waste water collection network.","_11_data_collection":"Supported projects.","_12_time_measurement_achieved":"At latest one year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Council Directive 91/271/EC concerning urban waste water treatment","_16_corresponding_corporate":"CCR09","_17_notes":"-","_18_link_to_2014_2020_common":"CO19","order_by_annex_1":"72","order_by_so":"25","order_by_output_result":"131","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR43","_2_indicator_name":"Water losses in distribution systems for public water supply","_2b_indicator_code_and_short":"RCR43 Water: Losses in public water supply distribution","_3_measurement_unit":"cubic metres per year","_4_type_of_indicator":"result","_5_baseline":">0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.5 Sustainable water","_9b_indicator_listing_by":"RSO2.5 Sustainable water","_10_definition_and_concepts":"Annual volume of water losses registered over a year in the distribution networks for public water supply. The indicator covers the water losses only for the pipes which are being financed through the projects implemented. The baseline refers to the annual volume of water losses for the respective pipes in the year before the intervention starts. The target refers to the annual volume of water losses in the year after the project is physically completed, and it can be zero if the intervention has a 100% success in eliminating water losses in the respective part of the network. \nThe indicator will be used to calculate the percentage reduction of water losses as a result of projects supported.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"The indicator is meant to be used when the objective of the intervention is to reduce water losses in a specific part of the distribution network of the public water supply.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"73","order_by_so":"25","order_by_output_result":"132","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO34","_2_indicator_name":"Additional capacity for waste recycling","_2b_indicator_code_and_short":"RCO34 Circular: Additional capacity for waste recycling","_3_measurement_unit":"tonnes/year","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.6 Circular economy and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.6 Circular economy","_10_definition_and_concepts":"The annual nominal additional capacity for annual waste recycling newly built due to the supported projects. The indicator also covers capacity extensions but not maintenance of existing capacity. \nWaste recycling is to be understood as any recovery operation by which waste materials are reprocessed into products, materials or substances whether for the original or other purposes. It does not include energy recovery and the reprocessing into materials that are to be used as fuels or for backfilling operations (see Directive 2008/98/EC in references).\nIn case the capacities for recycling cannot be measured then this indicator shall not be used (i.e. where recycling is carried out in the same facilities also processing raw-materials, e.g. waste oil is refined in refineries which also process raw oil).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"For context and related definitions in the areas of waste see Directive 2008/98/EC of the European Parliament and of the Council on waste","_16_corresponding_corporate":"CCO11","_17_notes":"-","_18_link_to_2014_2020_common":"CO17","order_by_annex_1":"74","order_by_so":"26","order_by_output_result":"27","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO107","_2_indicator_name":"Investments in facilities for separate waste collection","_2b_indicator_code_and_short":"RCO107 Circular: Investments in separate waste collection","_3_measurement_unit":"euro","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.6 Circular economy and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.6 Circular economy","_10_definition_and_concepts":"Total investments in supported projects for facilities for separate waste collection. Separate collection means the collection where a waste stream is kept separately by type and nature so as to facilitate a specific treatment( see Directive 2008/98/EC in references).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2008/98/EC of the European Parliament and of the Council on waste","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"75","order_by_so":"26","order_by_output_result":"79","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO119","_2_indicator_name":"Waste prepared for re-use","_2b_indicator_code_and_short":"RCO119 Circular: Waste prepared for re-use","_3_measurement_unit":"tonnes/year","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.6 Circular economy and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.6 Circular economy","_10_definition_and_concepts":"The indicator measures the annual volume of waste ‘prepared for re-use’. Prepared for reuse can involve checking, cleaning or repairing recovery operations, by which products or components of products that have become waste are prepared so that they can be re-used without any other pre-processing (see Directive 2008/98/EC in references).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2008/98/EC of the European Parliament and of the Council on waste","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"76","order_by_so":"26","order_by_output_result":"91","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR103","_2_indicator_name":"Waste collected separately","_2b_indicator_code_and_short":"RCR103 Circular: Waste collected separately","_3_measurement_unit":"tonnes/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.6 Circular economy","_9b_indicator_listing_by":"RSO2.6 Circular economy","_10_definition_and_concepts":"The indicator measures additional annual tonnage of waste collected separately due to the investments in facilities for separate collection of waste in supported projects.\nFor the definition of separate collection of waste see RCO107 and Directive 2008/98/EC in references.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Directive 2008/98/EC of the European Parliament and of the Council on waste","_16_corresponding_corporate":"-","_17_notes":"On the basis of Commission Decision 1004/2019 (laying down rules for the calculation, verification and reporting of data on waste in accordance with Directive 2008/98/EC) the separate collection of municipal waste can be recorded voluntarily.  Indicator RCR103 implies that the value be voluntarily collected and reported in our programmes when the collection system is EU funded.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"77","order_by_so":"26","order_by_output_result":"110","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR47","_2_indicator_name":"Waste recycled","_2b_indicator_code_and_short":"RCR47 Circular: Waste recycled","_3_measurement_unit":"tonnes/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.6 Circular economy and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.6 Circular economy","_10_definition_and_concepts":"The indicator measures additional annual tonnage of waste recycled due to additional capacity created through the supported projects. The waste recycled is to be measured in terms of tonnage at the stage of preparation for recycling. \nFor the definition of waste recycling see RCO34 and Directive 2008/98/EC in references.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Directive 2008/98/EC of the European Parliament and of the Council on waste","_16_corresponding_corporate":"CCR10","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"78","order_by_so":"26","order_by_output_result":"133","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR48","_2_indicator_name":"Waste used as raw materials","_2b_indicator_code_and_short":"RCR48 Circular: Waste used as raw materials","_3_measurement_unit":"tonnes/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.6 Circular economy and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.6 Circular economy","_10_definition_and_concepts":"The indicator measures additional annual tonnage of waste made available as raw materials as a result of the supported projects.  In comparison to RCR47 this indicator seeks to measure the volume of recycled waste that is made available following recycling process","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"79","order_by_so":"26","order_by_output_result":"134","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO36","_2_indicator_name":"Green infrastructure supported for other purposes than adaptation to climate change","_2b_indicator_code_and_short":"RCO36 Env: Green infrastructure (not related to climate change)","_3_measurement_unit":"hectares","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.7 Nature protection and biodiversity and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.7 Nature protection and biodiversity","_10_definition_and_concepts":"Surface area of green infrastructure newly built or significantly upgraded for other purposes than adaptation to climate change. Upgrades refer to significant improvements in existing green infrastructures eligible for support. Maintenance is excluded. \nExamples of green infrastructure include biodiversity-rich parks, permeable soil cover, green walls, green roofs, green schoolyards etc. (see EEA 2011 in references)\nThis indicator does not cover green infrastructure supported for adaptation to climate change (covered by indicator RCO26) or investments in Natura 2000 (covered by indicator RCO37).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"EEA (2011) - Green infrastructure and territorial cohesion, Technical report 18","_16_corresponding_corporate":"CCO16","_17_notes":"This indicator is meant to be used to reflect interventions for green infrastructure supported for other purposes than adaptation to climate change in order to prevent the overlap with the common indicator RCO26.","_18_link_to_2014_2020_common":"New","order_by_annex_1":"80","order_by_so":"27","order_by_output_result":"28","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO37","_2_indicator_name":"Surface of Natura 2000 sites covered by protection and restoration measures","_2b_indicator_code_and_short":"RCO37 Env: Surface of Natura 2000 sites","_3_measurement_unit":"hectares","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.7 Nature protection and biodiversity","_9b_indicator_listing_by":"RSO2.7 Nature protection and biodiversity","_10_definition_and_concepts":"Surface area of Natura 2000 sites covered by protection and restoration measures financed by the supported projects. These measures need to be in line with the prioritised action framework (PAF). \n\nThe PAFs are strategic multiannual planning tools aimed at providing a comprehensive overview of the measures that are needed to implement the EU-wide Natura 2000 network and linking them to the corresponding EU funding instruments (see Council Directive 92/43/EEC in references).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nA given area in a Natura 2000 site should be counted once even if covered by several projects financed in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Council Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora.","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO23 covered sites both in or outside Natura 2000","order_by_annex_1":"81","order_by_so":"27","order_by_output_result":"29","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO38","_2_indicator_name":"Surface area of rehabilitated land supported","_2b_indicator_code_and_short":"RCO38 Env: Surface area of rehabilitated land supported","_3_measurement_unit":"hectares","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.7 Nature protection and biodiversity and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.7 Nature protection and biodiversity","_10_definition_and_concepts":"Surface area of rehabilitated land in contaminated areas (such as, for example former military sites, old or illegal landfill sites, etc.)  which is made available for reuse (such as green areas, social housing, economic, cultural, sports or community activities, etc.). \nThe interventions supported should be in accordance with the principle of environmental liability, as defined in Directive 2004/35 (see references).\nFor the definition of land contamination see Article 2.1.(c) of the Directive.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2004/35/CE of the European Parliament and of the Council on environmental liability with regard to the prevention and remedying of environmental damage.","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO22","order_by_annex_1":"82","order_by_so":"27","order_by_output_result":"30","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO39","_2_indicator_name":"Area covered by systems for monitoring air pollution installed","_2b_indicator_code_and_short":"RCO39 Env: Area covered by systems for monitoring air pollution","_3_measurement_unit":"air quality zones","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.7 Nature protection and biodiversity and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.7 Nature protection and biodiversity","_10_definition_and_concepts":"The indicator measures the number of air quality zones / agglomerations with one or more additional air quality monitoring stations financed through the supported projects.\nEU Clean Air Policy mandates the assessment of ambient air quality on the basis of common methods and criteria. For this purpose, Member States establish ‘air quality zones and agglomerations’ throughout their territory, and in each of these, air quality monitoring networks are installed. These networks can be further expanded by adding additional sampling points that comply with the methods and criteria defined in, and reported in accordance with, the Ambient Air Quality Directives (Directive 2008/50 and 2004/107). Such sampling points provide both validated and up-to-date assessment data.\nMaintenance or repair are excluded.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Ambient Air Quality Directives 2008/50 and 2004/107.","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"83","order_by_so":"27","order_by_output_result":"31","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR50","_2_indicator_name":"Population benefiting from measures for air quality","_2b_indicator_code_and_short":"RCR50 Env: Population benefiting from measures for air quality","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO2.7 Nature protection and biodiversity","_10_definition_and_concepts":"Population living or working in treated areas with an improved air quality. Measures for improving air quality can include, for example, green infrastructure, cleaner public transport, redirection of traffic, etc. \nThe measurement of air quality should be performed over a period of one year. The population can be estimated ex-post based, for example, on maps for air quality.\nImproved air quality should be interpreted in line with the terms of Directive 2008/50/EC (see references), and it should be documented based on monitoring systems and stations for air quality.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Directive 2008/50/EC of the European Parliament and of the Council on ambient air quality and cleaner air for Europe","_16_corresponding_corporate":"CCR11","_17_notes":"The indicator is meant to be used when the objective of the intervention is to improve air quality in the respective area.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"84","order_by_so":"27","order_by_output_result":"135","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR95","_2_indicator_name":"Population having access to new or improved green infrastructure","_2b_indicator_code_and_short":"RCR95 Env: Pop. with access to green infrastructure","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO2.7 Nature protection and biodiversity","_10_definition_and_concepts":"Estimated population living within a 2 km radius from the public green infrastructure built or significantly ugraded in urban areas and supported by the projects (see EC 2012 study in references).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"The Multifunctionality of Green Infrastructure, European Commission, DG Environment, in-depth study March 2012","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"85","order_by_so":"27","order_by_output_result":"162","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR52","_2_indicator_name":"Rehabilitated land used for green areas, social housing, economic or other uses","_2b_indicator_code_and_short":"RCR52 Env: Rehabilitated land","_3_measurement_unit":"hectares","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.7 Nature protection and biodiversity and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.7 Nature protection and biodiversity","_10_definition_and_concepts":"Surface area of rehabilitated land in contaminated areas which is supported by the project and for which rehabilitation is complemented by an action plan adopted to redevelop and reuse the site (such as for green areas, social housing, economic, cultural, sports or community activities).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"At latest one year after the completion of the rehabilitation process.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"86","order_by_so":"27","order_by_output_result":"136","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO55","_2_indicator_name":"Length of new tram and metro lines","_2b_indicator_code_and_short":"RCO55 Urban Trans: Length of new tram and metro lines","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.8 Sustainable urban mobility and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Length of newly built tram and metro lines financed by the supported projects. The indicator covers also urban/suburban rail lines. Urban and suburban rail lines refer to networks that are functionally separate from the rest of the railway system and intended only for the operation of local, urban or suburban passenger services (see Directive 2008/57/EC in references). \nIn case of interventions on the tracks of tram, metro or urban/suburban rail linesk, length is to be interpreted in terms of track length.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2008/57/EC of the European Parliament and of the Council on the interoperability of the rail system within the Community.","_16_corresponding_corporate":"CCO16","_17_notes":"-","_18_link_to_2014_2020_common":"CO15","order_by_annex_1":"87","order_by_so":"28","order_by_output_result":"46","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO56","_2_indicator_name":"Length of reconstructed or modernised tram and metro lines","_2b_indicator_code_and_short":"RCO56 Urban Trans: Length of tram and metro lines","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.8 Sustainable urban mobility and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Length of reconstructed or modernised tram and metro lines financed by the supported projects. The indicator covers also the urban/suburban rail lines. \nFor the definition of urban and suburban lines - see indicator RCO55 ( and also Directive 2008/57/EC in references). \nIn case of interventions on the tracks of tram, metro or urban/suburban rail, length is to be interpreted in terms of track length. \nUpgrading and modernisation refer to any significant intervention which does not amount to maintenance or repairs.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2008/57/EC of the European Parliament and of the Council on the interoperability of the rail system within the Community.","_16_corresponding_corporate":"CCO16","_17_notes":"-","_18_link_to_2014_2020_common":"CO15","order_by_annex_1":"88","order_by_so":"28","order_by_output_result":"47","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO57","_2_indicator_name":"Capacity of environmentally friendly rolling stock for collective public transport","_2b_indicator_code_and_short":"RCO57 Urban Trans: rolling stock for public transport","_3_measurement_unit":"passengers","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Passenger capacity of environmentally friendly rolling stock for collective public transport financed by supported projects (manufacturer specified seated and standing passenger capacity). \nEnvironmentally friendly rolling stock includes low-carbon or zero emmission collective public transport (buses, trolley buses, trams, metros, etc.).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"89","order_by_so":"28","order_by_output_result":"48","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO58","_2_indicator_name":"Dedicated cycling infrastructure supported","_2b_indicator_code_and_short":"RCO58 Urban Trans: Dedicated cycling infrastructure supported","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Length of dedicated cycling infrastructure newly built or significantly upgraded by projects supported. Dedicated cycling infrastructure includes cycling facilities separated from roads for vehicular traffic or other parts of the same road by structural means (kerbs, barriers), cycling streets, cycling tunnels, etc. For cycling infrastructure with separated oneway lanes (ex: on each side of a road), the length is measured as lane length.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"90","order_by_so":"28","order_by_output_result":"49","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO59","_2_indicator_name":"Alternative fuels infrastructure (refuelling/ recharging points)","_2b_indicator_code_and_short":"RCO59 Urban Trans: Alternative fuels infrastructure","_3_measurement_unit":"refuelling/recharging points","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Number of refuelling/ recharging points (new or upgraded) for clean vehicles financed through supported projects.\nA recharging point means an interface that is capable of charging one electric vehicle at a time or exchanging a battery of one electric vehicle at a time. A refuelling point refers to a refuelling facility for the provision of alternative fuel through a fixed or a mobile installation.\nAlternative fuel means fuels or power sources which serve, at least partly, as a subtitute for fossil oil sources in the energy supply to transport and which have the potential to contribute to its decarbonisation and enhance the environmental performance of the transport sector.\n(see Directive 2014/94 in references).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2014/94 /EU of the European Parliament and of the Council on the deployment of alternative fuels infrastructure","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"91","order_by_so":"28","order_by_output_result":"50","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO60","_2_indicator_name":"Cities and towns with new or modernised digitised urban transport systems","_2b_indicator_code_and_short":"RCO60 Urban Trans: Digitised urban transport systems (cities)","_3_measurement_unit":"cities and towns","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.8 Sustainable urban mobility and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Number of cities and towns with new or modernised digitised urban transport systems financed by supported projects. The indicator covers public transport systems for passengers. For the purpose of this indicator, modernisation refers to integration of digitised transport systems, adoption of new technologies, and other significant changes for the digitalisation of the urban transport system. Maintenance or marginal improvements are excluded. \nThe indicator also covers intelligent transport systems, defined as systems in which information and communication technologies are applied in the field of road transport, including infrastructure, vehicle and users, and in traffic management and mobility management, as well as for interface with other modes of transport (see Directive 2010/40/EU in references).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective\nA city or town with several projects financed in the same specific objective should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Directive 2010/40/EU of the European Parliament and of the Council on the framework for the development of Intelligent Transport Systems in the field of road transport and for interfaces with other modes of transport.","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"92","order_by_so":"28","order_by_output_result":"51","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR62","_2_indicator_name":"Annual users of new or modernised public transport","_2b_indicator_code_and_short":"RCR62 Urban Trans: Annual users of public transport","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.8 Sustainable urban mobility and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Annual users of new or modernised public transport financed by supported projects. Public transport covers urban and suburban, such as bus, trolley bus, water bus lines (which are not tram, metro – see RCR63). Modernisation of public transport refers to signficant improvements in terms of infrastructure, and access and quality of service.\nThe baseline of the indicator is estimated as the number of users of the transport service in the year before the intervention starts, and it is zero for new services. The achieved value is estimated ex post as the number of users of the transport service for the year after the physical completion of the intervention.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Directive 2008/57/EC of the European Parliament and of the Council on the interoperability of the rail system within the Community.","_16_corresponding_corporate":"-","_17_notes":"RCR63 values are not reported under this indicator.\nIn terms of measurement methodologies the following methodology support provided on RCR58 may be relevant: “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :   https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"93","order_by_so":"28","order_by_output_result":"144","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR63","_2_indicator_name":"Annual users of new or modernised tram and metro lines","_2b_indicator_code_and_short":"RCR63 Urban Trans: Annual users of tram and metro lines","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.8 Sustainable urban mobility and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Annual users of new or modernised tram and metro lines financed by supported projects. The indicator covers also urban and suburban rail lines. Modernisation of these transport services refers to signficant improvements in terms of infrastructure, and access and quality of service. \nFor the definition of urban/ suburban rail lines see indicator RCO55 (and Directive 2008/57/EC in references). \nThe baseline of the indicator refers to the number of users estimated for the transport service in the year before the intervention starts, and it is zero for new services. The achieved value is estimated ex post as the number of users of the transport service for the year after the physical completion of the intervention","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"Directive 2008/57/EC of the European Parliament and of the Council on the interoperability of the rail system within the Community.","_16_corresponding_corporate":"CCR15","_17_notes":"RCR62 values are not reported under this indicator. \nIn terms of measurement methodologies the following methodology support provided on RCR58 may be relevant: “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :   https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"94","order_by_so":"28","order_by_output_result":"145","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR64","_2_indicator_name":"Annual users of dedicated cycling infrastructure","_2b_indicator_code_and_short":"RCR64 Urban Trans: Annual users of cycling infrastructure","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe and under JTF","_8b_po_igj_original":"PO2","_9_indicator_usage_by_specific":"RSO2.8 Sustainable urban mobility and JSO8.1 JTF","_9b_indicator_listing_by":"RSO2.8 Sustainable urban mobility","_10_definition_and_concepts":"Annual users of dedicated cycling infrastructure financed by supported projects. \n\nFor the definition of dedicated cycling infrastructure see indicator RCO58.\n\nThe baseline of the indicator is estimated as the annual number of users of the infrastructure for the year before the intervention starts, and it is zero for new infrastructure. The achieved values are estimated ex-post in terms of the number of users using the infrastructure for the year after the physical completion of the intervention.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"See “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :  https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"95","order_by_so":"28","order_by_output_result":"146","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO43","_2_indicator_name":"Length of new or upgraded roads - TEN-T","_2b_indicator_code_and_short":"RCO43 Road: Length of new or upgraded roads - TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total length of TEN-T road sections newly built or upgraded. Upgrades refer to changes in capacity and quality that would lead to requalifying a non-TEN-T road to the TEN-T standard (see Regulation 1315/2013 in references). \nThe indicator covers all relevant TEN-T roads (motorways and other classes). Roads are generally bi-directional (at least one lane in each direction.  Road length shall be measured as the length of a bi-directional road (lane kilometres shall not be reported).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Regulation (EU) 1315/2013 of the European Parliament and of the Council on Union guidelines for the development of the trans-European transport network and repealing Decision no. 661/2010/EU","_16_corresponding_corporate":"CCO14","_17_notes":"When a project is reported under this indicator it cannot be counted under indicator ‘RCO45 Length of roads reconstructed or modernised - TEN-T’.","_18_link_to_2014_2020_common":"CO13a","order_by_annex_1":"96","order_by_so":"31","order_by_output_result":"34","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO45","_2_indicator_name":"Length of roads reconstructed or modernised - TEN-T","_2b_indicator_code_and_short":"RCO45 Road: Length of roads reconstructed or modernised - TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total length of TEN-T road sections reconstructed or modernised due to the supported projects (see Regulation 1315/2013 in references). Interventions could include construction works such as rebuilding, resurfacing, realignment etc.\nRoads are generally bi-directional (at least one lane in each direction.  Road length shall be measured as the length of a bi-directional road (lane kilometres shall not be reported).\nThe indicator does not cover interventions for traffic management systems (which are included in RCO108 for TEN-T). Furthermore, maintenance and repair (e.g. road patches, road markings) are excluded.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Regulation (EU) 1315/2013 of the European Parliament and of the Council on Union guidelines for the development of the trans-European transport network and repealing Decision no. 661/2010/EU","_16_corresponding_corporate":"CCO14","_17_notes":"When a project is reported under this indicator it cannot be counted under indicator ‘RCO43 Length of new or upgraded roads - TEN-T’.","_18_link_to_2014_2020_common":"CO14a","order_by_annex_1":"97","order_by_so":"31","order_by_output_result":"36","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO108","_2_indicator_name":"Length of roads with new or modernised traffic management systems - TEN-T","_2b_indicator_code_and_short":"RCO108 Road: Length of roads with TMS - TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Length of TEN-T road sections with new or modernised traffic management systems due to the supported projects. Examples of such interventions include systems for incident response, speed control, tolling or other demand management systems, cctv, automatic vehicle detection and recording, etc.  For the purpose of this indicator modernisation refers to new significant functionalities for existing traffic management systems. \n\nRoads are generally bi-directional (at least one lane in each direction.  Road length shall be measured as the length of a bi-directional road (lane kilometres shall not be reported).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).\nWhen a project is reported under this indicator it cannot be counted under indicator RCO43","_15_references":"Regulation (EU) 1315/2013 of the European Parliament and of the Council on Union guidelines for the development of the trans-European transport network and repealing Decision no. 661/2010/EU","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"98","order_by_so":"31","order_by_output_result":"80","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO47","_2_indicator_name":"Length of new or upgraded rail - TEN-T","_2b_indicator_code_and_short":"RCO47 Rail: Length of new or upgraded rail - TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total length of TEN-T rail sections newly built or upgraded. Upgrades refer to significant rail works and to changes in capacity and quality that would lead to requalifying a non-TEN-T rail section to the TEN-T standard (see Regulation 1315/2013 in references). The indicator measures the length of tracks.\nThe length of TEN-T railway tracks constructed by the project is measured in the following cases: \na) where no railway existed before; \nb) where there is a physical realignment of the rail designed to improve performance; \nc) where a single track railway is developed into a double or multiple tracks, and \nd) where the changes in capacity and quality lead to upgrading the rail to the TEN-T standard.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Regulation (EU) 1315/2013 of the European Parliament and of the Council on Union guidelines for the development of the trans-European transport network and repealing Decision no. 661/2010/EU","_16_corresponding_corporate":"CCO15","_17_notes":"Urban and suburban train lines are covered by indicator RCO56.","_18_link_to_2014_2020_common":"CO11a","order_by_annex_1":"99","order_by_so":"31","order_by_output_result":"38","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO49","_2_indicator_name":"Length of rail reconstructed or modernised - TEN-T","_2b_indicator_code_and_short":"RCO49 Rail: Length of rail reconstructed or modernised - TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total length of TEN-T rail sections reconstructed or modernised in order to improve performance (see Regulation 1315/2013 in references). Such interventions could cover rail features such as electrification, speed and safety.  The indicator measures the length of tracks.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Regulation (EU) 1315/2013 of the European Parliament and of the Council on Union guidelines for the development of the trans-European transport network and repealing Decision no. 661/2010/EU","_16_corresponding_corporate":"CCO15","_17_notes":"Interventions for ERTMS are included in the common indicator RCO109. Urban and suburban train lines are covered by indicator RCO56.","_18_link_to_2014_2020_common":"CO12a","order_by_annex_1":"100","order_by_so":"31","order_by_output_result":"40","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO51","_2_indicator_name":"Length of new, upgraded or modernised inland waterways - TEN-T","_2b_indicator_code_and_short":"RCO51 Waterways: Length of inland waterways - TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total length of TEN-T inland waterways sections with new, upgraded or modernised navigation capacity (see Regulation 1315/2013 in references). Upgraded or modernised navigation capacity refers to improved traffic capacity and safety. \nIn case of localised interventions aimed to remove bottlenecks (locks) the length of the improved section shall be counted.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Regulation (EU) 1315/2013 of the European Parliament and of the Council on Union guidelines for the development of the trans-European transport network and repealing Decision no. 661/2010/EU","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO16","order_by_annex_1":"101","order_by_so":"31","order_by_output_result":"42","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO109","_2_indicator_name":"Length of European Rail Traffic Management System equipped railways in operation - TEN-T","_2b_indicator_code_and_short":"RCO109 Rail: Length of ERTMS equipped railways - TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Length of railways equiped with European Traffic Management System (ERTMS) due to the supported projects  (see Regulation 1315/2013 in references). The indicator measures the length of tracks covered by the intervention.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"As soon as the ERTMS system installed becomes operational.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Regulation (EU) 1315/2013 of the European Parliament and of the Council on Union guidelines for the development of the trans-European transport network and repealing Decision no. 661/2010/EU","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"102","order_by_so":"31","order_by_output_result":"81","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO44","_2_indicator_name":"Length of new or upgraded roads - non-TENT","_2b_indicator_code_and_short":"RCO44 Road: Length of new or upgraded roads - non-TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.2 Sustainable transport, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Total length of non-TEN-T road sections newly built or upgraded. Upgrades refer to changes in capacity and quality that would lead to upgrading the classification of the road according to national definitions.\nRoads are generally bi-directional (at least one lane in each direction.  Road length shall be measured as the length of a bi-directional road (lane kilometres shall not be reported). \nThe length of newly built roads is measured when: a) no road existed before, b) as a consequence of project completion, the capacity and quality of a previously existing national/local/secondary road (not on the TEN-T network) is upgraded to reach a higher classification (e.g. national road or equivalent).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO22","_17_notes":"In this case the road cannot be counted under indicator ‘RCO46 Length of roads reconstructed or modernised - non-TEN-T’.","_18_link_to_2014_2020_common":"CO13","order_by_annex_1":"103","order_by_so":"32","order_by_output_result":"35","_0_erdf":true}
,{"_1_indicator_code":"RCO46","_2_indicator_name":"Length of roads reconstructed or modernised - non-TENT","_2b_indicator_code_and_short":"RCO46 Road: Length of roads- non-TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.2 Sustainable transport, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Total length of non-TEN-T road sections reconstructed or modernised due to the supported projects. Interventions could include construction works such as rebuilding, resurfacing, realignment etc.\nRoads are generally bi-directional (at least one lane in each direction.  Road length shall be measured as the length of a bi-directional road (lane kilometres shall not be reported).\nThe indicator does not cover interventions for traffic management systems (which are included in RCO109 for non-TENT). Furthermore, maintenance and repair (e.g. road patches, road markings) are excluded.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO22","_17_notes":"Newly constructed and upgraded non-TENT roads are included in RCO44.","_18_link_to_2014_2020_common":"CO14","order_by_annex_1":"104","order_by_so":"32","order_by_output_result":"37","_0_erdf":true}
,{"_1_indicator_code":"RCO110","_2_indicator_name":"Length of roads with new or modernised traffic management systems - non-TEN-T","_2b_indicator_code_and_short":"RCO110 Road: Length of roads with TMS (non-TEN-T)","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.2 Sustainable transport, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Length of non-TEN-T road sections with new or modernised traffic management systems due to the supported projects. Examples of such interventions include systems for ncident response, speed control, tolling or other demand management systems, cctv, automatic vehicle detection and recording, etc.  For the purpose of this indicator modernisation refers to new significant functionalities for existing traffic management systems. \nRoads are generally bi-directional (at least one lane in each direction.  Road length shall be measured as the length of a bi-directional road (lane kilometres shall not be reported).","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO22","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"105","order_by_so":"32","order_by_output_result":"82","_0_erdf":true}
,{"_1_indicator_code":"RCO48","_2_indicator_name":"Length of new or upgraded rail - non-TENT","_2b_indicator_code_and_short":"RCO48 Rail: Length of new or upgraded rail - non-TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.2 Sustainable transport, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Total length of non-TENT rail sections newly built or upgraded. Upgrades refer to changes in capacity and quality that would lead to upgrading the classification of the rail according to national definitions. The indicator measures the length of tracks.\nThe length of non-TEN-T railway tracks constructed by the project is measured in the following cases: a) where no railway existed before; b) where there is a physical realignment of the rail designed to improve performance; c) where a single track railway is developed into a double track, and d) where the changes in capacity and quality upgrades the rail to higher national classification.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO23","_17_notes":"Non-TENT reconstructed and modernised rail should be included in RCO50. Urban and suburban train lines are covered by indicator RCO56.","_18_link_to_2014_2020_common":"CO11","order_by_annex_1":"106","order_by_so":"32","order_by_output_result":"39","_0_erdf":true}
,{"_1_indicator_code":"RCO50","_2_indicator_name":"Length of rail reconstructed or modernised - non-TENT","_2b_indicator_code_and_short":"RCO50 Rail: Length of rail - non-TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.2 Sustainable transport, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Total length of non-TENT rail sections reconstructed or modernised.  Such interventions could cover rail features such as electrification, speed and safety.  The indicator measures the length of tracks.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO23","_17_notes":"Urban and suburban train lines are covered by indicator RCO56. New or upgraded non-TENT are included in indicator RCO48.","_18_link_to_2014_2020_common":"CO12","order_by_annex_1":"107","order_by_so":"32","order_by_output_result":"41","_0_erdf":true}
,{"_1_indicator_code":"RCO111","_2_indicator_name":"Length of European Rail Traffic Management System equipped railways in operation - non-TENT","_2b_indicator_code_and_short":"RCO111 Rail: Length of ERTMS equipped railways - non-TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.2 Sustainable transport, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Length of non-TENT railways equiped with European Traffic Management System (ERTMS) due to the supported projects. The indicator measures the length of tracks covered by the intervention.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"As soon as the ERTMS system installed becomes operational.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO23","_17_notes":"Urban and suburban train lines are covered by indicator RCO56. New or upgraded non-TENT are included in indicator RCO48.","_18_link_to_2014_2020_common":"CO12","order_by_annex_1":"108","order_by_so":"32","order_by_output_result":"83","_0_erdf":true}
,{"_1_indicator_code":"RCO52","_2_indicator_name":"Length of new or modernised inland waterways- non- TEN-T","_2b_indicator_code_and_short":"RCO52 Waterways: Length of inland waterways- non- TEN-T","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.2 Sustainable transport, RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Total length of non-TEN-T inland waterways sections with new, upgraded or modernised navigation capacity. Upgraded or modernised navigation capacity refers to improved traffic capacity and safety. \n\nIn case of localised interventions aimed to remove bottlenecks (locks) the length of the improved section shall be counted.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO16","order_by_annex_1":"109","order_by_so":"32","order_by_output_result":"43","_0_erdf":true}
,{"_1_indicator_code":"RCO53","_2_indicator_name":"New or modernised railway stations and stops","_2b_indicator_code_and_short":"RCO53 Rail: New or modernised railway stations and stops","_3_measurement_unit":"stations and stops","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Number of railway stations and stops newly created or modernised due to supported projects. Modernisation refers to significant measures such as improving passenger comfort and safety, ensuring accessibility for people with reduce mobility, reducing noise etc.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Intermodal connections such as parking areas should be included in RCO54.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"110","order_by_so":"32","order_by_output_result":"44","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCO54","_2_indicator_name":"New or modernised intermodal connections","_2b_indicator_code_and_short":"RCO54 Multimodal: New or modernised intermodal connections","_3_measurement_unit":"intermodal connections","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO3.2 Sustainable transport","_10_definition_and_concepts":"Number of new or modernised intermodal connections (nodes) that facilitate the use of different means of transport for freight transport or passenger trips.  The same connection shall not be counted twice in cases two or more improvements took place at different points in time.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Railways stations are included in RCO53.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"111","order_by_so":"32","order_by_output_result":"45","_0_erdf":true,"_0_cohesion_fund_72":true}
,{"_1_indicator_code":"RCR55","_2_indicator_name":"Annual users of newly built, reconstructed, upgraded or modernised roads","_2b_indicator_code_and_short":"RCR55 Road: Annual users of roads","_3_measurement_unit":"passenger-km/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.2 Sustainable transport and RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total number of passenger-km travelled on roads newly built, upgraded, reconstructed or modernised due to the supported project. The achieved value is to be estimated ex-post for the period of one year after the completion of the intervention. The indicator baseline refers to the estimated number of passenger-km travelled on the respective road in the year before the intervention starts, and it can be zero for new roads.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"See “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :  https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"112","order_by_so":"31","order_by_output_result":"139","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR56","_2_indicator_name":"Time savings due to improved road infrastructures","_2b_indicator_code_and_short":"RCR56 Road: Time savings due to improved road infrastructures","_3_measurement_unit":"man-days/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.2 Sustainable transport and RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total time savings for  transport on road infrastructure improved due to supported projects. The achieved value is to be estimated ex post over a period of one year after the completion of the intervention.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR13","_17_notes":"See “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :  https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf   \n\n \n\nThe measurement unit “man-days/year” was chosen to make the calculation more understandable in terms of labour market measurements.   \n\nHaving made the calculation of time savings as described in the JASPERS paper the project promoter / programme should simply divide passenger hours/year by the average working hours per day. The average working week in the EU is just over 37 hrs => 1 day :  7.4 hours  (2019) https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Hours_of_work_-_annual_statistics \n\nNational averages vary and could be taken into account in fixing the variable to calculate average working hours per day","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"113","order_by_so":"31","order_by_output_result":"140","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR101","_2_indicator_name":"Time savings due to improved rail infrastructures","_2b_indicator_code_and_short":"RCR101 Rail: Time savings due to improved infrastructures","_3_measurement_unit":"man-days/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.2 Sustainable transport and RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total time savings for  transport on rail infrastructure improved due to supported projects. The achieved value is to be estimated ex post over a period of one year after the completion of the intervention.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"See “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :  https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf   \n\n \n\nThe measurement unit “man-days/year” was retained to make the calculation more understandable in terms of labour market measurements.   \n\nHaving made the calculation of time savings as described in the JASPERS paper the project promoter / programme should simply divide passenger hours/year by the average working hours per day. The average working week in the EU is just over 37 hrs => 1 day :  7.4 hours  (2019) https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Hours_of_work_-_annual_statistics \n\nNational averages vary and could be taken into account in fixing the variable to calculate average working hours per day","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"114","order_by_so":"31","order_by_output_result":"108","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR58","_2_indicator_name":"Annual users of newly, built, upgraded, reconstructed or modernised railways","_2b_indicator_code_and_short":"RCR58 Rail: Annual users railways","_3_measurement_unit":"passenger-km/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.2 Sustainable transport and RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total number of passenger-km travelled on railways newly built, upgraded, reconstructed or modernised due to the supported project. The achieved value is to be estimated ex-post for the period of one year after the completion of the intervention. The indicator baseline refers to the estimated number of passenger-km travelled on the respective rail line in the year before the intervention starts, and it can be zero for new rail lines.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR 14","_17_notes":"See “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :  https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"115","order_by_so":"31","order_by_output_result":"141","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR59","_2_indicator_name":"Freight transport on rail","_2b_indicator_code_and_short":"RCR59 Rail: Freight transport on rail","_3_measurement_unit":"tonnes-km/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.2 Sustainable transport and RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total freight weight transported on railways newly constructed, upgraded, reconstructed and modernised due to the supported projects. The achieved value is to be estimated ex-post over a period of one year after the completion of the intervention. The indicator baseline refers to the total freight weight transported on the respective rail line in the year before the intervention starts, and it can be zero for a new rail line.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"See “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :  https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"116","order_by_so":"31","order_by_output_result":"142","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR60","_2_indicator_name":"Freight transport on inland waterways","_2b_indicator_code_and_short":"RCR60 Waterways: Freight transport on inland waterways","_3_measurement_unit":"tonnes-km/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_8b_po_igj_original":"PO3","_9_indicator_usage_by_specific":"RSO3.1 Sustainable TEN-T, RSO3.2 Sustainable transport and RSO3.3 Military mobility","_9b_indicator_listing_by":"RSO3.1 Sustainable TEN-T","_10_definition_and_concepts":"Total freight weight transported on inland waterways newly constructed, upgraded, reconstructed and modernised due to the supported projects. The achieved value is to be estimated ex-post over a period of one year after the completion of the intervention. The indicator baseline refers to the total freight weight transported on the respective inland waterway in the year before the intervention starts, and it can be zero for a new inland waterway.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"See “Methodological support for ERDF and Cohesion Fund result indicators in the field of transport post 2020” JASPERS (2021) :  https://ec.europa.eu/regional_policy/sources/policy/evaluations/guidance/2021/transport-indicators/methodl_support_indicators_post_2020_en.pdf","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"117","order_by_so":"31","order_by_output_result":"143","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO61","_2_indicator_name":"Surface of new or modernised facilities for employment services","_2b_indicator_code_and_short":"RCO61 PES: Surface of facilities for employment services","_3_measurement_unit":"square metres","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.1 Labour market infrastructure and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.1 Labour market infrastructure","_10_definition_and_concepts":"Surface area of facilities for employment services newly built or modernised. In the case of modernisation, only impacted surface areas should be counted. The indicator covers only construction works supported for such facilities, but it does not include energy renovation or maintenance and repairs.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO17","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"118","order_by_so":"41","order_by_output_result":"52","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR65","_2_indicator_name":"Annual users of new or modernised facilities for employment services","_2b_indicator_code_and_short":"RCR65 PES: Annual users of employment services","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.1 Labour market infrastructure and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.1 Labour market infrastructure","_10_definition_and_concepts":"The number of unique registered annual users of the new or modernised facility for employment services (including users accessing facilities via the internet or telephone). The number of registered users is to be determined based on the administrative records of the facility. The baseline of the indicator refers to the number of users registered for the year before the intervention starts, and it is zero for newly built facilities.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR16","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"119","order_by_so":"41","order_by_output_result":"147","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO66","_2_indicator_name":"Classroom capacity of new or modernised childcare facilities","_2b_indicator_code_and_short":"RCO66 Education: Classroom capacity of childcare facilities","_3_measurement_unit":"persons","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.2 Education and training infrastructure and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.2 Education and training infrastruture","_10_definition_and_concepts":"Classroom capacity in terms of maximum number of places in the new or modernised childcare facilities. Classroom capacity should be calculated in accordance with national legislation, but it should not include teachers, parents, auxiliary personnel or other persons who may use the facilities too. \nChildcare facilities such as crèches and pre-schools are designed for children from birth to the start of primary education. The indicator covers childcare facilities that are newly built or modernised (for example, for increasing hygiene and safety standards), and modernisation does not include energy renovation or maintenance and repairs.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO18","_17_notes":"-","_18_link_to_2014_2020_common":"CO35","order_by_annex_1":"120","order_by_so":"42","order_by_output_result":"55","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO67","_2_indicator_name":"Classroom capacity of new or modernised education facilities","_2b_indicator_code_and_short":"RCO67 Education: Classroom capacity of education facilities","_3_measurement_unit":"persons","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.2 Education and training infrastructure and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.2 Education and training infrastruture","_10_definition_and_concepts":"Classroom capacity in terms of maximum number of pupils/students who can be enrolled in and use the education facilities Classroom capacity should be calculated in accordance with national legislation, but it should not include teachers, parents, auxiliary personnel or other persons who may use the facilities too. \nEducation facilities, such as schools and universities, can be newly built or modernised. Modernisation does not include energy rennovation or maintenance and repairs.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO19","_17_notes":"-","_18_link_to_2014_2020_common":"CO35","order_by_annex_1":"121","order_by_so":"42","order_by_output_result":"56","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR70","_2_indicator_name":"Annual users of new or modernised childcare facilities","_2b_indicator_code_and_short":"RCR70 Education: Annual users of  childcare facilities","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.2 Education and training infrastructure and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.2 Education and training infrastruture","_10_definition_and_concepts":"Annual number of unique registered children using the childcare facility supported. For achieved values, the estimation should be carried out ex post based on the number and size of groups of children using the facility at least once during the year after the completion of the intervention. The baseline of the indicator refers to the number of users of the facility supported estimated for the year before the intervention starts, and it is zero for newly built facilities. \nThe indicator does not cover teachers, parents, auxiliary personnel or any other persons who may use the facility too.  \nChildcare facilities such as creches and pre-schools are designed for children from birth to the start of primary education. The indicator covers childcare facilities that are newly built or modernised (for example, for increasing hygiene and safety standards), and modernisation does not include energy rennovation or maintenance and repairs.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR17","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"122","order_by_so":"42","order_by_output_result":"150","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR71","_2_indicator_name":"Annual users of new or modernised education facilities","_2b_indicator_code_and_short":"RCR71 Education: Annual users of education facilities","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.2 Education and training infrastructure and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.2 Education and training infrastruture","_10_definition_and_concepts":"Annual number of unique registered pupils/ students using the education facility supported. For achieved values, the calculation should be carried out ex post based on the number and size of groups of pupils/students using the facility at least once during the year after the completion of the intervention. The baseline of the indicator refers to the number of users of the facility supported estimated for the year before the intervention starts, and it is zero for newly built facilities. The indicator does not cover teachers, parents, auxiliary personnel or any other persons who may use the facility too.  \nThe indicator covers education facilities such as schools and universities that are newly built or modernised, and modernisation does not include energy renovation or maintenance and repairs","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR17","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"123","order_by_so":"42","order_by_output_result":"151","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO65","_2_indicator_name":"Capacity of new or modernised affordable, sustainable and social housing","_2b_indicator_code_and_short":"RCO65 Social Infra: Capacity of new or modernised social housing","_3_measurement_unit":"persons","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO4.3 Integration of marginalised communities","_10_definition_and_concepts":"The maximum number of persons who can be accommodated in newly built or modernised affordable, sustainable and social housing facilities. Social housing refers to housing provided by government agencies, other public bodies or non-profit organisations for people on low incomes, disadvantaged, marginalised, or with particular needs.\nAffordable housing refers to a wider category than social housing. The definition of affordability can vary according to the circumstances of each Member State.  Member States can use their own definitions with criteria based on specific market conditions to capture the funding gap in affordable housing at national, regional or local level. The characteristics of target groups should take account of specific socio-economic contexts. This is without prejudice to the definition of affordable housing for State aid purpose.\nIt is expected that for all new affordable and social housing and the bulk of renovated affordable and social housing, energy efficiency remains an important component in the operations, in line with national and EU legislation. However, indicator RCO18 - Energy: Dwellings with improved energy peformance - is not available to be used under RSO4.3.\nInvestments should be compatible with the Energy Performance of Buildings Directive (as applicable). Operations must also comply with all CPR sustainable requirements (e.g. DNSH, climate-proofing).\nInvestments under the principles and values of the “New European Bauhaus” are encouraged.\nThe indicator does not cover maintenance and repairs.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO19","_17_notes":"The name of the indicator was changed in 2025, with the amendment of Regulations (EU) 2021/1058 and (EU) 2021/1056 in the context of the mid-term review, to give visibility to already existing related regulatory requirements (EPBD and CPR) and to widen its scope to affordable housing beyond social housing. Given the absence of an EU definition of “affordability”, Member States are responsible for defining their own criteria.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"124","order_by_so":"43","order_by_output_result":"54","_0_erdf":true,"edited_by_swd_2025_346":"MODIFIED"}
,{"_1_indicator_code":"RCO113","_2_indicator_name":"Population covered by projects in the framework of integrated actions for socio-economic inclusion of marginalised communities, low income households and disadvantaged groups","_2b_indicator_code_and_short":"RCO113 Integrated actions for inclusion of marginalised pop.","_3_measurement_unit":"persons","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant and under JTF","_9b_indicator_listing_by":"RSO4.3 Integration of marginalised communities","_10_definition_and_concepts":"Population benefitting directly from projects in the framework of integrated actions for socio-economic inclusion of marginalised communities, low income households and disadvantaged groups. \nIntegrated actions combine investments in two or more of the following social inclusion areas: employment, education and training, housing, health and social care.\nMarginalised communities, low income households and disadvantaged groups are defined at national level. \nThe indicator is also relevant under RSO4.4 Integration of third country nationals, incl. migrants.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Remove double counting at the level of the specific objective.\nPopulation in a given area should be counted once even if covered by several projects financed in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"125","order_by_so":"43","order_by_output_result":"85","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR67","_2_indicator_name":"Annual users of new or modernised affordable, sustainable and social housing","_2b_indicator_code_and_short":"RCR67 Social Infra: Annual users of social housing","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe, PO4 Social Europe, PO5 Europe closer to citizens and JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO2.11 Affordable housing, RSO4.3 Integration of marginalised communities, RSO4.7 Affordable housing, RSO5.3 Affordable housing and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.3 Integration of marginalised communities","_10_definition_and_concepts":"Number of persons using the newly build or modernised affordable, sustainable and social housing facilities during the year after the completion of the intervention supported. The computation has to be carried out ex post based on the registered number of household members accommodated. The baseline of the indicator refers to the number of users of the facility supported estimated for the year before the intervention starts, and it is zero for newly built facilities.\nFor definitions of affordable, sustainable and social housing, see RCO65.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR18","_17_notes":"The name of the indicator was changed in 2025, with the amendment of Regulations (EU) 2021/1058 and (EU) 2021/1056 in the context of the mid-term review, to give visibility to already existing related regulatory requirements (EPBD and CPR) and to widen its scope to affordable housing beyond social housing. Given the absence of an EU definition of “affordability”, Member States are responsible for defining their own criteria.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"126","order_by_so":"43","order_by_output_result":"149","_0_erdf":true,"edited_by_swd_2025_346":"MODIFIED"}
,{"_1_indicator_code":"RCO63","_2_indicator_name":"Capacity of new or modernised temporary reception facilities","_2b_indicator_code_and_short":"RCO63 Social Infra: Capacity of temporary reception facilities","_3_measurement_unit":"persons","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.4 Integration of third country nationals","_9b_indicator_listing_by":"RSO4.4 Integration of third country nationals","_10_definition_and_concepts":"Temporary reception facilities are used for accommodating asylum seekers for a given period of time. \nThe indicator covers the maximum number of places in newly created or modernised temporary reception facilities.\nThe indicator does not cover energy renovation or maintenance and repairs.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO19","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"127","order_by_so":"44","order_by_output_result":"53","_0_erdf":true}
,{"_1_indicator_code":"RCR66","_2_indicator_name":"Annual users of new or modernised temporary reception facilities","_2b_indicator_code_and_short":"RCR66 Social Infra: Annual users of reception facilities","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.4 Integration of third country nationals","_9b_indicator_listing_by":"RSO4.4 Integration of third country nationals","_10_definition_and_concepts":"Number of unique registered asylum seekers using the newly build or modernised temporary reception facilities at least once during the year after the completion of the intervention supported. The baseline of the indicator refers to the number of users of the facility supported estimated for the year before the intervention starts, and it is zero for newly built facilities.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR18","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"128","order_by_so":"44","order_by_output_result":"148","_0_erdf":true}
,{"_1_indicator_code":"RCO69","_2_indicator_name":"Capacity of new or modernised health care facilities","_2b_indicator_code_and_short":"RCO69  Health: Capacity of health care facilities","_3_measurement_unit":"persons/year","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.5 Access to health care and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.5 Access to health care","_10_definition_and_concepts":"The maximum annual number of persons that can be served by the new or modernised health care facility at least once during a period of one year. \nHealthcare facilities include hospitals, clinics, outpatient care centers,  specialized care centers etc.\nModernisation does not include energy renovation or maintenance and repairs.","_11_data_collection":"Supported project","_12_time_measurement_achieved":"When the respective medical services of the new or modernised healthcare facility supported are operational.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO20","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"129","order_by_so":"45","order_by_output_result":"57","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO70","_2_indicator_name":"Capacity of new or modernised social care facilities (other than housing)","_2b_indicator_code_and_short":"RCO70 Social Infra: Capacity of social care facilities","_3_measurement_unit":"persons/year","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.5 Access to health care and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.5 Access to health care","_10_definition_and_concepts":"The maximum number of persons that can  be served or cared for at least once during a period of one year by the social care facilities newly built or modernised. \nModernisation does not include social housing which is included in RCO65.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"When the respective social care services of the new or modernised facility supported become operational.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"130","order_by_so":"45","order_by_output_result":"58","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR72","_2_indicator_name":"Annual users of new or modernised e-health care services","_2b_indicator_code_and_short":"RCR72 Health: Annual users of e-health care services","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.5 Access to health care and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.5 Access to health care","_10_definition_and_concepts":"Annual number of registered unique users of the e-health care services newly created or modernised. Modernised services are to be considered in terms of new significant functionalities offered to the users. The achieved number of users is to be calculated over a period of one year after the completion of the intervention. The indicator baseline refers to the number of users during the year before the intervention starts, and it is zero for services newly created.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO36","order_by_annex_1":"131","order_by_so":"45","order_by_output_result":"152","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR73","_2_indicator_name":"Annual users of new or modernised health care facilities","_2b_indicator_code_and_short":"RCR73 Health: Annual users of health care facilities","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.5 Access to health care and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.5 Access to health care","_10_definition_and_concepts":"Number of registered patients served at least once by the new or modernised health care facility during the year after the completion of the intervention. The indicator baseline refers to the registered patients served at least once by the health care facility during the year before the start of the intervention, and it can be zero for new facilities.\n\nHealthcare facilities include hospitals, clinics, outpatient care centers,  specialized care centers etc.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year starting with the time when the new or modernised health care facility becomes operational.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"CCR19","_17_notes":"-","_18_link_to_2014_2020_common":"CO36","order_by_annex_1":"132","order_by_so":"45","order_by_output_result":"153","_0_erdf":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR74","_2_indicator_name":"Annual users of new or modernised social care facilities","_2b_indicator_code_and_short":"RCR74 Annual users of new or modernised social care facilities","_3_measurement_unit":"users/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"PO4 Social Europe and under JTF","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"RSO4.5 Access to health care and JSO8.1 JTF","_9b_indicator_listing_by":"RSO4.5 Access to health care","_10_definition_and_concepts":"Number of registered patients served at least once by the new or modernised social care facility during the year after the completion of the intervention. The indicator baseline refers to the registered patients served at least once by the social care facility during the year before the start of the intervention, and it can be zero for new facilities.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year starting with the time when the new or modernised social care facility becomes operational.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"133","order_by_so":"45","order_by_output_result":"154","_0_erdf":true,"_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO77","_2_indicator_name":"Number of cultural and tourism sites supported","_2b_indicator_code_and_short":"RCO77 Number of cultural and tourism sites supported","_3_measurement_unit":"cultural and tourism sites","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO4.6 Culture and sustainable tourism","_10_definition_and_concepts":"Number of cultural and tourism sited supported by the Funds.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon completion of output in supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"134","order_by_so":"46","order_by_output_result":"62","_0_erdf":true}
,{"_1_indicator_code":"RCR77","_2_indicator_name":"Visitors of cultural and tourism sites supported","_2b_indicator_code_and_short":"RCR77 Visitors of cultural and tourism sites","_3_measurement_unit":"visitors/year","_4_type_of_indicator":"result","_5_baseline":">=0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO4","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO4.6 Culture and sustainable tourism","_10_definition_and_concepts":"Estimated number of annual visitors of cultural and tourism sites supported. The estimation of the number of visitors should be carried out ex post for one year after the completion of the intervention. The baseline of the indicator refers to the estimated annual number of visitors of the supported sites for the year before the intervention starts, and it is zero for new cultural and tourism sites.\n\nThe indicator does not cover natural sites for which an accurate estimation of number of visitors is not feasible.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"One year after the completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO09","order_by_annex_1":"135","order_by_so":"46","order_by_output_result":"155","_0_erdf":true}
,{"_1_indicator_code":"RCO74","_2_indicator_name":"Population covered by projects in the framework of strategies for integrated territorial development","_2b_indicator_code_and_short":"RCO74 Population covered in integrated territorial development","_3_measurement_unit":"persons","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO5","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO5.1 Integrated development in urban areas","_10_definition_and_concepts":"Number of persons covered by projects supported by the Funds in the framework of strategies for integrated territorial development.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nDouble counting of population covered by several projects for the same strategy in the same specific objective should be removed.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"CCO21","_17_notes":"-","_18_link_to_2014_2020_common":"CO37","order_by_annex_1":"136","order_by_so":"51","order_by_output_result":"59","_0_erdf":true}
,{"_1_indicator_code":"RCO75","_2_indicator_name":"Strategies for integrated territorial development supported","_2b_indicator_code_and_short":"RCO75 Strategies for integrated territorial development","_3_measurement_unit":"contributions to strategies","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO5","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO5.1 Integrated development in urban areas","_10_definition_and_concepts":"Number of contributions to strategies for integrated territorial development reported by each specific objective contributing from the Funds in line with CPR Article 28 (a) and (c).\nThe indicator values therefore measure, at specific objective level, the discrete number of financial contributions to territorial strategies.\nThis indicator does not cover CLLD strategies which are counted under RCO80","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon completion of output of the first supported project under the territorial strategy.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nA strategy supported through several projects in the same specific objective should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Aggregating the values reported across specific objectives will count the number of contributions but not the (net) number of integrated territorial development strategies.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"137","order_by_so":"51","order_by_output_result":"60","_0_erdf":true}
,{"_1_indicator_code":"RCO76","_2_indicator_name":"Integrated projects for territorial development","_2b_indicator_code_and_short":"RCO76 Integrated projects for territorial development","_3_measurement_unit":"projects","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO5 Europe closer to citizens","_8b_po_igj_original":"PO5","_9_indicator_usage_by_specific":"RSO5.1 Integrated development in urban areas, RSO 5.2 Integrated development in areas other than urban.","_9b_indicator_listing_by":"RSO5.1 Integrated development in urban areas","_10_definition_and_concepts":"Number of integrated projects supported under integrated territorial development which are integrated in themselves in line with CPR Article 28. \nA project is considered integrated in itself if it fulfils at least one of the following conditions: a) the project involves different sectors (such as social, economic and environmental sectors) the project integrates several types pf stakeholders (public authorities, private actors, NGOs), b) the project involves  different administrative territories (ex: municipalities), and c) the project involves several types of stakeholders (public authorities, private actors, NGOs).","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon completion of output in supported project","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"138","order_by_so":"51","order_by_output_result":"61","_0_erdf":true}
,{"_1_indicator_code":"RCO80","_2_indicator_name":"Community-led local development strategies supported","_2b_indicator_code_and_short":"RCO80 Community-led local development strategies supported","_3_measurement_unit":"strategies","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO5","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO5.1 Integrated development in urban areas","_10_definition_and_concepts":"Number of contributions to Community-led local development strategies by each specific objective contributing from the Funds in line with CPR Article 28 (b). \nThe indicator values therefore measure, at specific objective level, the discrete number of financial contributions to CLLD strategies.\nContributions to other integrated territorial development strategies should be counted under RCO75.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon completion of output in of the first supported project under the territorial strategy.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nA CLLD strategy supported through several projects in the same specific objective should be counted once.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Aggregating the values reported across specific objectives will count the number of contributions but not the (net) number of CLLDs.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"139","order_by_so":"51","order_by_output_result":"63","_0_erdf":true}
,{"_1_indicator_code":"RCO112","_2_indicator_name":"Stakeholders involved in the preparation and implementation of strategies for integrated territorial development","_2b_indicator_code_and_short":"RCO112 Stakeholders in integrated territorial development","_3_measurement_unit":"participations of institutional stakeholders","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"PO5 Europe closer to citizens","_8b_po_igj_original":"PO5","_9_indicator_usage_by_specific":"RSO5.1 Integrated development in urban areas; SO 5.2 Integrated development in areas other than urban.","_9b_indicator_listing_by":"RSO5.1 Integrated development in urban areas","_10_definition_and_concepts":"Number of citizens and institutional stakeholders involved in the preparation and implementation of strategies for integrated territorial development.  Stakeholders participating in several meetings / events are to counted multiple times. If two or more representatives from the same stakeholder organisation participate in the same meeting, the organisation is to be counted once. \nStakeholder engagement activities limited only to inform and consult stakeholders are not to be counted.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"After completion of the consultation activity","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"The indicator is to be used to measure the participations of stakeholder financed by technical assistance from the programme.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"140","order_by_so":"51","order_by_output_result":"84","_0_erdf":true}
,{"_1_indicator_code":"RCO114","_2_indicator_name":"Open space created or rehabilitated in urban areas","_2b_indicator_code_and_short":"RCO114 Open space created or rehabilitated in urban areas","_3_measurement_unit":"square metres","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"PO5","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"RSO5.1 Integrated development in urban areas","_10_definition_and_concepts":"Surface area of renovated / newly developed accessible open public spaces. \nThe indicator includes open public spaces according to the UN definition: “all places that are publicly owned or of public use, accessible and enjoyable by all, for free and without a profit motive”. \nOpen public spaces can include parks, community gardens, pocket parks, plazas, squares, river banks, beachfronts, etc. \nThe indicator does not include significant interventions covered by other common indicators (i.e. where the primary objectives is to modernise roads, rehabilitate land, etc.). \nMaintenance and repairs are excluded.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in supported projects","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Glossary of the Habitat III (United Nations Conference on Housing and Sustainable Urban Development) Preparatory Process and the Conference (published in 2017)","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"CO38","order_by_annex_1":"141","order_by_so":"51","order_by_output_result":"86","_0_erdf":true}
,{"_1_indicator_code":"RCO81","_2_indicator_name":"Participations in joint actions across borders","_2b_indicator_code_and_short":"RCO81 Interreg: Participation in joint actions across borders","_3_measurement_unit":"participations","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of participations in joint actions across borders implemented in the supported projects. Joint actions across borders could include, for instance, exchange activities or exchange visits organized with partners across borders. Participations (i.e. number of persons attending a joint action across borders - e.g. citizens, volunteers, students, pupils, public officials, etc.) are counted for each joint action organised on the basis of attendance lists or other relevant means of quantification. \nA joint action is considered as the action organised with the involvement of organizations from at least two participating countries (for programmes falling under strands A, B, C as defined in the Interreg Regulation) or is developed in the scope of programmes falling under strands D or E as defined in the Interreg Regulation.\nParticipations in public events organized in supported projects should not be counted in this indicator.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"Potential overlap with RCO82 and RCO85. See the \"Notes\" section for further clarifications on how to avoid double counting and multiple reporting.","_14_reporting":"Rule 1: Reporting by specific objective","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Participations in public events should not be counted in RCO81. The number of public events organized in supported projects should be reported by RCO115. \nWhen reporting on RCO81, the participations in internal project meetings of the partners should not be counted. Values reported under this indicator shall not be reported under RCO82 or RCO85. Participations in joint training schemes for which the training organisers intend to record the confirmed completions / intend to issue certificates of completion should not be counted in RCO81, but in RCO85. \nIn order to avoid double counting of participations, the joint actions relevant for this indicator (i.e. RCO81) should not have the main topics linked to gender equality, equal opportunities and social exclusion, as the participations in these events are counted by RCO82. \nIn terms of links with common result indicators, RCO81 may be used together with RCR85.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"142","order_by_so":"60","order_by_output_result":"64","_0_erdf":true}
,{"_1_indicator_code":"RCO115","_2_indicator_name":"Public events across borders jointly organised","_2b_indicator_code_and_short":"RCO115 Interreg: Public events across borders jointly organised","_3_measurement_unit":"events","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of events across border which were jointly organised by the partners in supported projects or by interregional programmes, and not the number of participations in public events. A public event across borders is understood as a joint action which has been adverstised through relevant means, to the general public of the area covered by the programme. A joint action is considered as the action organised with the involvement of organizations from at least two participating countries (for programmes falling under strands A, B, C as defined in the Interreg Regulation) or is developed in the scope of programmes falling under strands D or E as defined in the Interreg Regulation. A public event across borders should have participants from at least two countries of the programme area.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective. Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"The participation of the project staff in public events is not sufficient for ensuring the condition of participants from at least two countries of the programme area.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"143","order_by_so":"60","order_by_output_result":"87","_0_erdf":true}
,{"_1_indicator_code":"RCO82","_2_indicator_name":"Participations in joint actions promoting gender equality, equal opportunities and social inclusion","_2b_indicator_code_and_short":"RCO82 Interreg: Participations in horizontal principles actions","_3_measurement_unit":"participations","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of participations in joint activities principally adressing horizontal principles (gender equality, equal opportunities and social inclusion) implemented in the supported projects. Joint actions could include, for instance, exchange activities or exchange visits. Participations (i.e. number of persons attending a joint action) are counted for each joint activity organised on the basis of attendance lists or other relevant means of quantification. \nA joint action is considered as the action organised with the involvement of organizations from at least two participating countries (for programmes falling under strands A, B, C as defined in the Interreg Regulation) or is developed in the scope of programmes falling under strands D or E as defined in the Interreg Regulation.\nParticipations in public events  promoting gender equality, equal opportunities and social inclusion, organized in supported projects, should not be counted in this indicator.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"Exclude overlap with RCO81 and RCO85. See the \"Notes\" section for further clarifications on how to avoid double counting and multiple reporting.","_14_reporting":"Rule 1: Reporting by specific objective. Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Values reported under this indicator shall not be reported under RCO81 or RCO85. \nParticipations reported under RCO82 should be based only on joint actions which have the main topics focused on gender equality, equal opportunities and social exclusion. \nParticipations in trainings in the field of promoting gender equality, equal opportunities and social inclusion, should be counted in RCO85. \nParticipations in public events organized on the topics of promoting gender equality, equal opportunities and social inclusion should not be counted in RCO 82. \nThe public events organized on the topics of promoting gender equality, equal opportunities and social inclusion shall be reported as number of events (not participations) in RCO 115. \nParticipation in all other joint actions only marginally targeting the topics of gender equality, equal opportunities and social inclusion, should be counted in RCO81. \nIn terms of links with common result indicators, RCO 82 may be used together with RCR 85.","_18_link_to_2014_2020_common":"CO45","order_by_annex_1":"144","order_by_so":"60","order_by_output_result":"65","_0_erdf":true}
,{"_1_indicator_code":"RCO83","_2_indicator_name":"Strategies and action plans jointly developed","_2b_indicator_code_and_short":"RCO83 Interreg: Strategies and action plans jointly developed","_3_measurement_unit":"strategy/action plan","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of joint strategies or action plans developed by supported projects. A jointly developed strategy aims at establishing a targeted way to achieve a goal oriented process in a specific domain. An action plan translates an existing jointly developed strategy into actions. Jointly developed strategy or action plan implies the involvement of organizations from at least two participating countries (for programmes falling under strands A, B, C as defined in the Interreg Regulation) in the drafting process of the strategy or action plan or is developed in the scope of programmes falling under strands D or E as defined in the Interreg Regulation.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"If a strategy or action plan covers several specific objectives, it should be counted only for the dominant specific objective. For a project aiming to implement specific jointly developed strategies or action plans, previously developed, a different output indicator should be used to report on the implementation of action plans, such as, for example, RCO84. If the respective joint strategy or action plan was also developed in the scope of the project or if the solution was developed based on the strategy/action plan, the indicator RCO83 may be used together with RCO 84 and/or RCO 116.","_14_reporting":"Rule 1: Reporting by specific objective. Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In terms of links with common result indicators, RCO83 may be used together with RCR79.\nIn case RCO83 is used together with RCO84 and/or RCO116, the common result indicators which may be used are RCR79 and/or RCR104.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"145","order_by_so":"60","order_by_output_result":"66","_0_erdf":true}
,{"_1_indicator_code":"RCO84","_2_indicator_name":"Pilot actions developed jointly and implemented in projects","_2b_indicator_code_and_short":"RCO84 Interreg: Pilot actions developed and implemented jointly","_3_measurement_unit":"pilot action","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the pilot actions developed jointly and implemented by supported projects. The scope of a jointly developed pilot action could be to test procedures, new instruments, tools, experimentation or the transfer of practices. In order to be counted by this indicator, \n- the pilot action needs not only to be developed, but also implemented within the project \n- the implementation of the pilot action should be finalised by the end of the project. \nJointly developed pilot action implies the involvement of organizations from at least two participating countries (for programmes falling under strands A, B, C as defined in the Interreg Regulation) in its implementation or is implemented in the scope of programmes falling under strands D or E as defined in the Interreg Regulation.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"Should a project foresee over the course of its implementation both the jointly development of strategies or action plans and their implementation through jointly developed pilot actions or jointly developed solutions,  indicators RCO84 may be used together with RCO 83 and/or RCO 116 be used.","_14_reporting":"Rule 1: Reporting by specific objective. Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5)","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"This indicator can also be used in the framework of strand 4 and 5 as defined by the Interreg Regulation.\nIn case RCO84 is used together with RCO83 and/or RCO116, the common result indicators which may be used are RCR79 and/or RCR104.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"146","order_by_so":"60","order_by_output_result":"67","_0_erdf":true}
,{"_1_indicator_code":"RCO116","_2_indicator_name":"Jointly developed solutions","_2b_indicator_code_and_short":"RCO116 Interreg: Jointly developed solutions","_3_measurement_unit":"solutions","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of jointly developed solutions from joint pilot actions implemented by supported projects. In order to be counted in the indicator, an identified solution should include indications of the actions needed for it to be taken up or to be upscaled. MA monitoring system\nA jointly developed solution implies the involvement of organizations from at least two participating countries (for programmes falling under strands A, B, C as defined in the Interreg Regulation) in the drafting and design process of the solution or is developed in the scope of programmes within strands D or E as defined in the Interreg Regulation.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"Exclude overlap with RCO117.  See notes for details on how to avoid double counting.","_14_reporting":"Rule 1: Reporting by specific objective. Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In order to avoid double counting, the solutions relevant for this indicator (i.e. RCO116) should not have the main topics linked to administrative or legal frameworks, as these are counted in indicator RCO117.\nFor all other topics of the solutions, the the indicator used for counting is RCO116. \nRCO116 may be used together with RCO83 and/or RCO84.\nIn case RCO116 is used together with RCO83 and/or RCO84, the common result indicators which may be used are RCR79 and/or RCR104.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"147","order_by_so":"60","order_by_output_result":"88","_0_erdf":true}
,{"_1_indicator_code":"RCO85","_2_indicator_name":"Participations in joint training schemes","_2b_indicator_code_and_short":"RCO85 Interreg: Participations in joint training schemes","_3_measurement_unit":"participations","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of participations in joint training schemes. Participations in a joint training schemes are intended to be counted as registered participants who started the training. \nA joint training scheme implies:\n- the involvement of organizations from at least two participating countries (for programmes falling under strands A, B, C as defined in the Interreg Regulation) in the organisation of the training\nor\n- is developed in the scope of programmes falling under strand D or E as defined in the Interreg Regulation. \nA joint training scheme requires building knowledge in a certain topic and involves the training of participants over several sessions. A one-off meeting/event/internal session where information is disseminated should not be considered as a training scheme.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"Potential overlap in reporting with RCO 81. See notes for further clarification on reporting. \nDouble counting of participants in more than one training schemes organised by the same project should be excluded.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Values reported under this indicator shall not be reported under RCO81 or RCO82. \nRCO85 is not counting the number of participants who finalised the joint training schemes - this is done through RCR81.    \nJoint trainings for which the training organisers do not intend to record the confirmed completions / do not intend to issue certificates of completion should be considered under the generic term of \"joint actions\" - the participations in this case should be counted in RCO81, not in RCO85.\nIn terms of links with common result indicators, RCO85 is intended to be used together with RCR81 and may be used together with RCR85.","_18_link_to_2014_2020_common":"CO46","order_by_annex_1":"148","order_by_so":"60","order_by_output_result":"68","_0_erdf":true}
,{"_1_indicator_code":"RCO117","_2_indicator_name":"Solutions for legal or administrative obstacles across border identified","_2b_indicator_code_and_short":"RCO117 Interreg: Solutions identified for legal/admin. obstacles","_3_measurement_unit":"solutions","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"Legal or administrative obstacles refer to rules, laws or administrative procedures which obstruct everyday life and the development of those border regions eligible under ETC goal. The indicator counts the number of solutions identified for resolving/ alleviating such legal or administrative obstacles across borders.\nLegal or administrative obstacles are in general identified on the basis of an in-depth analysis of the territorial context, which provides meaningful inputs on the functioning legal and administrative frameworks. The identified solution(s) should be customised according to the specificities of each territory and cooperation context. In order to be counted in the indicator, an identified solution should be accompanied by indications of possible actions to be taken for its potential implementation.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"Exclude overlap with RCO116. See notes for details on how to avoid double counting.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In order to avoid double counting, the solutions relevant for this indicator (i.e. RCO117) should have the main topics linked to administrative or legal frameworks.\nFor all other jointly developed solutions, the indicator to be used for counting is RCO116. \nIn terms of links with common result indicators, RCO117 may be used together with RCR82.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"149","order_by_so":"60","order_by_output_result":"89","_0_erdf":true}
,{"_1_indicator_code":"RCO86","_2_indicator_name":"Joint administrative or legal agreements signed","_2b_indicator_code_and_short":"RCO86 Interreg: Joint administrative or legal agreements signed","_3_measurement_unit":"legal or administrative agreement","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the joint administrative or legal agreements signed related to opportunities for cooperation across borders or targeted to resolving/ alleviating legal or aministrative obstacles. The adoption / signature of an agreement counted should be accomplished by the time of project completion.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"A joint administrative or legal agreement can be considered as an identified solution and counted also in indicator RCO117, only if the concept and definition of RCO117 are applicable and relevant for the phases leading up to the drafting and signature of the joint administrative or legal agreement.","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"A joint administrative or legal agreement can be considered as an identified solution and counted also in indicator RCO117, only if the concept and definition of RCO117 are applicable and relevant for the joint administrative or legal agreement signed. \nIn terms of links with common result indicators, RCO86 is intended to be used together with RCR83.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"150","order_by_so":"60","order_by_output_result":"69","_0_erdf":true}
,{"_1_indicator_code":"RCO87","_2_indicator_name":"Organisations cooperating across borders","_2b_indicator_code_and_short":"RCO87 Interreg: Organisations cooperating across borders","_3_measurement_unit":"organisations","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the organisations cooperating formally in supported projects. The organisations counted in this indicator are the legal entities including project partners and associated organizations, as mentioned in the financing agreement of the application. Organisations cooperating formally in small projects (for instance under a Small Project Fund) are also counted.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"At specific objective level, double counting should be avoided at the level of project partners and associated organizations.","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"RCO87 may be used together with RCO118, where relevant. \nIn terms of links with common result indicators, RCO87 is intended be used together with RCR84.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"151","order_by_so":"60","order_by_output_result":"70","_0_erdf":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO118","_2_indicator_name":"Organisations cooperating for the multi-level governance of macroregional strategies","_2b_indicator_code_and_short":"RCO118 Interreg: Organisations cooperating for MLG of MRSs","_3_measurement_unit":"organisations","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of legal entities supported by the programme, listed in the financing agreements, and also contributing to the multi-level governance of macroregional strategies. As a concept, the multi-level governance refers to collective decision making processes where authority and influence are shared between stakeholders operating at multiple levels of governance and in different policy sectors. This concept may be customised and understood according to the context of each macroregional strategy.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"At specific objective level, double counting should be avoided at the level of project partners and associated organizations.","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"RCO118 is intended to be used together with and as a subset of RCO87. \nRCO118 is especially relevant and is expected to be used mostly in the context of strand B of Interreg.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"152","order_by_so":"60","order_by_output_result":"90","_0_erdf":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCO90","_2_indicator_name":"Projects for innovation networks across borders","_2b_indicator_code_and_short":"RCO90 Interreg: Projects for innovation networks across borders","_3_measurement_unit":"projects","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of projects creating, continuing or extending networks for enterprise innovation across borders. In order for the projects to be counted in the indicator, the created, continued or extended network(s) should be operational at the time of the project finalisation.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"-","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"153","order_by_so":"60","order_by_output_result":"71","_0_erdf":true}
,{"_1_indicator_code":"RCO120","_2_indicator_name":"Projects supporting cooperation across borders to develop urban-rural linkages","_2b_indicator_code_and_short":"RCO120 Interreg: Projects supporting urban-rural linkages","_3_measurement_unit":"projects","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of projects which aim, as a primary objective, to enhance the cooperation across borders between urban and rural areas. The urban-rural linkages developed within the project should enable a stronger urban-rural cooperation and partnership for implementing initiatives in various key relevant policy areas.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"Upon project finalisation","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"https://ec.europa.eu/regional_policy/en/policy/what/territorial-cohesion/urban-rural-linkages/","_16_corresponding_corporate":"-","_17_notes":"Cooperation between urban-rural areas on the same side of the border can be reported by this indicator, as long as organisations from at least two participating countries are involved in delivering the cooperation activities.\nThis indicator could be used for example in a cooperation project (with partners from at least two participant countries) in a twin city surrounded by rural areas.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"154","order_by_so":"60","order_by_output_result":"92","_0_erdf":true}
,{"_1_indicator_code":"RCR79","_2_indicator_name":"Joint strategies and action plans taken up by organisations","_2b_indicator_code_and_short":"RCR79 Interreg: Joint strategies and action plans taken up","_3_measurement_unit":"joint strategy/action plan","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of joint strategies and action plans (not individual actions) adopted and implemented by organisations during or after the project completion. At the time of reporting this indicator, the implementation of the joint strategy or action plan need not to be completed but effectively started. The organisations involved in take-up may or may not be direct participants in the supported project. It is not necessary that all actions identified are taken-up for a strategy/action plan to be counted in this context. The value report should be equal to or less than the value for \"RCO83 Strategies and action plans jointly developed\".","_11_data_collection":"MA monitoring system / Survey","_12_time_measurement_achieved":"Up to one year after project completion","_13_aggregation_issues":"If a strategy or action plan covers several specific objectives, it should be counted only for the dominant specific objective.","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 6).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"If a strategy or action plan covers several specific objectives, it should be counted only for the dominant specific objective.\nIn terms of links with common output indicator, RCR79 may be used together with RCO83 and/or RCO84 and/or RCO116.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"155","order_by_so":"60","order_by_output_result":"156","_0_erdf":true}
,{"_1_indicator_code":"RCR104","_2_indicator_name":"Solutions taken up or up-scaled by organisations","_2b_indicator_code_and_short":"RCR104 Interreg: Solutions taken up or up-scaled","_3_measurement_unit":"solutions","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of solutions, other than legal or administrative solutions, that are developed by supported projects and are taken up or upscaled during the implementation of the project or within one year after project completion. The organisation adopting the solutions developed by the project may or may not be a participant in the project. The uptake / up-scaling should be documented by the adopting organisations in, for instance, strategies, action plans etc.","_11_data_collection":"MA monitoring system / Survey","_12_time_measurement_achieved":"During project implementation / up to one year after project completion","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 6).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In terms of links with common output indicator, RCR104 may be used together with RCO116 and/or RCO83 and/or RCO84.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"156","order_by_so":"60","order_by_output_result":"111","_0_erdf":true}
,{"_1_indicator_code":"RCR83","_2_indicator_name":"Persons covered by joint administrative or legal agreements signed","_2b_indicator_code_and_short":"RCR83 Interreg: Persons covered by joint agreements signed","_3_measurement_unit":"persons","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of persons in the programme area who could potentially benefit from the opportunities/ services established by the joint administrative or legal agreements signed in the context of the supported projects. In line with the corresponding output indicator RCO86, the joint agreement signed should refer to identified obstacles across borders. For a given NUTS3 region, the number of potential persons reported under this indicator cannot be higher than the population of the programme region.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"At project completion","_13_aggregation_issues":"The value of the indicator at specific objective level cannot be higher than the total population of the territory addressed by the programme. The MA should cross-check the territory covered by the projects reporting this indicator. In case several projects are reporting broadly on the same territory and corresponding population, the MA should cap the cumulated value of the indicator value reported in aggregate from those projects to the population of the territory concerned.","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 6).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In terms of links with common output indicators, indicator RCR83 is intended to be used together with RCO86.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"159","order_by_so":"60","order_by_output_result":"159","_0_erdf":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR84","_2_indicator_name":"Organisations cooperating across borders after project completion","_2b_indicator_code_and_short":"RCR84 Interreg: Organisations cooperating post-project","_3_measurement_unit":"organisations","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the organisations cooperating across borders after the completion of the supported projects. The organisations are legal entities involved in project implementation, counted within RCO87. The cooperation concept should be interpreted as having a statement that the entities have a formal agreement to continue cooperation, after the end of the supported project. The cooperation agreements may be established during the implementation of the project or within one year after the project completion. The sustained cooperation does not have to cover the same topic as addressed by the completed project.","_11_data_collection":"MA monitoring system / Survey","_12_time_measurement_achieved":"During project implementation / up to one year after project completion","_13_aggregation_issues":"At specific objective level, double counting should be avoided at the level of project partners and associated organizations.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 6).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In terms of links with common output indicator, RCR84 may be used together with RCO87. \nThe value reported for RCR84 can be equal to or lower than the value of RCO87, but not higher.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"160","order_by_so":"60","order_by_output_result":"160","_0_erdf":true,"edited_by_swd_2025_61":"true"}
,{"_1_indicator_code":"RCR85","_2_indicator_name":"Participations in joint actions across borders after project completion","_2b_indicator_code_and_short":"RCR85 Interreg: Participations in actions post-project","_3_measurement_unit":"participations","_4_type_of_indicator":"result","_5_baseline":"0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Use in all policy objectives, whenever relevant","_8b_po_igj_original":"Interreg","_9_indicator_usage_by_specific":"Use in all specific objectives, whenever relevant","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"The indicator counts the number of participations in joint actions across borders after the completion of the project, organised by all or some of the former partners or associated organisations within the project, as a continuation of cooperation. Joint actions across borders could include, for instance, exchange activities or exchange visits organized with participants from at least two countries of the programme area. Participations (i.e. number of persons attending a joint action across borders) are counted for each joint action organised on the basis of attendance lists or other relevant means of quantification. For the definition of this indicator, the joint action includes training schemes.","_11_data_collection":"MA monitoring system / Survey","_12_time_measurement_achieved":"Up to one year after project completion","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective Forecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 6).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"In terms of links with common output indicator, RCR85 may be used together with RCO81 and/or RCO82 and/or RCO85.","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"161","order_by_so":"60","order_by_output_result":"161","_0_erdf":true}
,{"_1_indicator_code":"RCO121a","_2_indicator_name":"Enterprises supported to achieve the reduction of greenhouse-gas emissions from activities listed in Annex I to Directive 2003/87/EC","_2b_indicator_code_and_short":"RCO121a JTF: Enterprises supported to reduce GHG (Dir 2003/87)","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":">=0","_7_target_2029":">0","_8_policy_objective_asterisks":"Just Transition","_8b_po_igj_original":"JTF","_9_indicator_usage_by_specific":"JTF","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"Enterprises supported to achieve the reduction of greenhouse-gas emissions from activities listed in Annex I to Directive 2003/87/EC \nFor enterprise definition - see RCO01","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"It depends on the type of support: grant (see RCO02), financial instruments (see RCO03) or non-monetary (see RCO04).","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many types of support (ex: grants and financial instrument support) receives from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date for total RCO120  (CPR Annex VII, Table 5). Disaggregation of reported data by enterprise size required only for achieved values.","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"Use together with indicators for forms of support (RCO02. RCO03, RCO04) as follows: RCO01=RCO02+RCO03+RCO04 - number enterprises with multiple forms of support (i.e. remove double counting). Check: RCO01<= (RCO02+RCO03+RCO04)","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"162","order_by_so":"70","order_by_output_result":"94","_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCR29a","_2_indicator_name":"Estimated greenhouse-gas emissions from activities listed in Annex I to Directive 2003/87/EC in supported enterprises","_2b_indicator_code_and_short":"RCR29a JTF: Est. GHG emissions in enterprises (Dir. 2003/87/EC)","_3_measurement_unit":"tonnes CO2 eq./year","_4_type_of_indicator":"result","_5_baseline":">0","_6_milestone_2024":"not required","_7_target_2029":">0","_8_policy_objective_asterisks":"Just Transition","_8b_po_igj_original":"JTF","_9_indicator_usage_by_specific":"JTF","_9b_indicator_listing_by":"Interreg","_10_definition_and_concepts":"Total estimated GHG emissions for supported enterprises. The baseline refers to the level of estimated GHG emissions during the year before the intervention starts, and the achieved value is calculated as the total estimated GHG emissions based on the achieved level of energy performance during the year after the completion of the intervention.\nThe values reported under this indicator shall not be reported under “RCR29 Climate: Estimated greenhouse emissions”, in order to avoid the need for operations supported to use two GHG indicators.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of the intervention and availability of energy performance certificates, energy audits, or other relevant technical specifications or the measurement of emission reductions based on activity levels reported by the refurbished installation.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 9).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"For further clarification on methodologies available see the proceedings of the joint REGIO Evalnet / EIB seminar of November 2020 here: https://ec.europa.eu/regional_policy/en/policy/evaluations/guidance/#1","_18_link_to_2014_2020_common":"NEW","order_by_annex_1":"163","order_by_so":"70","order_by_output_result":"122","_0_just_transition_fund_64":true}
,{"_1_indicator_code":"RCO125","_2_indicator_name":"Enterprises supported linked primarily to digital technologies and deep tech innovation productive investments (STEP)","_2b_indicator_code_and_short":"RCO125 Firms: digital technologies STEP","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":"not applicable","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe, PO2 Greener Europe and JTF","_9_indicator_usage_by_specific":"RSO1.6 Contributing to strategic technologies, RSO2.9 Contributing to clean strategic technologies and JSO8.1 JTF","_10_definition_and_concepts":"Number of enterprises receiving support as part of the Strategic Technologies for Europe Platform (STEP) for productive investments into the development or manufacturing of critical technologies in the sector of digital technologies and deep tech innovation. These encompass a wide array of technologies such as advanced semiconductors, artificial intelligence, robotics and quantum technologies. \n\n \n\nFor the definition of an enterprise see RCO01. For further guidance on the types of support eligible under STEP, please consult the Guidance Note concerning certain provisions of Regulation (EU) 2024/795 establishing the Strategic Technologies for Europe Platform (STEP).","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"For grants: completion of output financed by the grant support. \n\nFor loans and guarantees: first payment from the bank to the final recipient of the underlying loan. For venture capital, first investment from the support to in the final recipient.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective. \nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective. \n\n \n\nRule 2: In a case where the enterprise is active in more than one of the targeted STEP sectors, the enterprise should only be counted once, per SO, using the predominant sector and corresponding RCO.","_14_reporting":"Rule 1: Reporting by specific objective \n\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"See RCO01 for enterprises \n\nRegulation (EU) 2024/795 establishing the Strategic Technologies for Europe Platform (STEP).","_16_corresponding_corporate":"-","_17_notes":"RCO125 should be used in conjunction with RCO01 (i.e. included in values for RCO01) and used in parallel with indicators for the form of suppport, as relevant (RCO02, RCO03, RCO04).  \n\nIf used under the JTF, encode as a programme specific indicator with the code ‘RCO125a’.","_18_link_to_2014_2020_common":"NEW","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"NEW"}
,{"_1_indicator_code":"RCO126","_2_indicator_name":"Enterprises supported linked primarily to clean and resource efficient technologies productive investment","_2b_indicator_code_and_short":"RCO126 Firms: clean technologies STEP","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":"not applicable","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe, PO2 Greener Europe and JTF","_9_indicator_usage_by_specific":"RSO1.6 Contributing to strategic technologies, RSO2.9 Contributing to clean strategic technologies and JSO8.1 JTF","_10_definition_and_concepts":"Number of enterprises receiving support as part of the Strategic Technologies for Europe Platform (STEP) for productive investments into the development or manufacturing of of critical technologies in the areas of resource- efficiecnt and clean technologies. Clean technologies innovations foster environmentally sustainable, cost-effective solutions to the green transition.  STEP accelerates the development and manufacturing of clean energy technologies, energy storage innovations, and decarbonisation solutions. \n\n \n\nFor the definition of an enterprise see RCO01. For further guidance on the types of support eligible under STEP, please consult the Guidance Note concerning certain provisions of Regulation (EU) 2024/795 establishing the Strategic Technologies for Europe Platform (STEP).","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"For grants: completion of output financed by the grant support. \n\nFor loans and guarantees: first payment from the bank to the final recipient of the underlying loan. For venture capital, first investment from the support in the final recipient.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective \nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective. \n\n \n\nRule 2: In a case where the enterprise is active in more than one of the targeted STEP sectors, the enterprise should only be counted once, per SO, using the predominant sector and corresponding RCO.","_14_reporting":"Rule 1: Reporting by specific objective \n\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"See RCO01 for enterprises \n\nRegulation (EU) 2024/795 establishing the Strategic Technologies for Europe Platform (STEP)","_16_corresponding_corporate":"-","_17_notes":"RCO126 should be used in conjunction with RCO01 (i.e. included in values for RCO01) and used in parallel with indicators for the form of suppport, as relevant (RCO02, RCO03, RCO04).\n\n \n\nIf used under the JTF, encode as a programme specific indicator with the code ‘RCO126a’.","_18_link_to_2014_2020_common":"NEW","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"NEW"}
,{"_1_indicator_code":"RCO127","_2_indicator_name":"Enterprises supported linked primarily to biotechnologies productive investments (STEP)","_2b_indicator_code_and_short":"RCO127 Firms: biotechnologies STEP","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":"not applicable","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe, PO2 Greener Europe and JTF","_9_indicator_usage_by_specific":"RSO1.6 Contributing to strategic technologies, RSO2.9 Contributing to clean strategic technologies and JSO8.1 JTF","_10_definition_and_concepts":"Number of enterprises receiving support as part of the Strategic Technologies for Europe Platform (STEP) for productive investments into the development or manufacturing of biotechnologies. Biotechnology is the use of biology to solve problems and make useful products. A prominent areas of biotechnology application are healthcare, farming, and the bioeconomy. \n\n \n\nFor the definition of an enterprise see RCO01. For further guidance on the types of support eligible under STEP, please consult the Guidance Note concerning certain provisions of Regulation (EU) 2024/795 establishing the Strategic Technologies for Europe Platform (STEP).","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"For grants: completion of output financed by the grant support. \n\nFor loans and guarantees: first payment from the bank to the final recipient of the underlying loan. For venture capital, first investment from the support in the final recipient.","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective \nAn enterprise is counted once regardless of how many times it receives support from operations in the same specific objective. \n\n \n\nRule 2: In a case where the enterprise is active in more than one of the targeted STEP sectors, the enterprise should only be counted once, per SO, using the predominant sector and corresponding RCO.","_14_reporting":"Rule 1: Reporting by specific objective \n\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"See RCO01 for enterprises \n\nRegulation (EU) 2024/795 establishing the Strategic Technologies for Europe Platform (STEP)","_16_corresponding_corporate":"-","_17_notes":"RCO127 should be used in conjunction with RCO01 (i.e. included in values for RCO01) and used in parallel with indicators for the form of suppport , as relevant (RCO02, RCO03, RCO04). \n\n \nIf used under the JTF, encode as a programme specific indicator with the code ‘RCO127a’.","_18_link_to_2014_2020_common":"NEW","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_61":"NEW"}
,{"_1_indicator_code":"RCO128","_2_indicator_name":"Enterprises supported linked primarily to foster dual use and defence capabilities (RearmEU)","_2b_indicator_code_and_short":"RCO128 Firms: Dual use and defence","_3_measurement_unit":"enterprises","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":"not applicable","_7_target_2029":">0","_8_policy_objective_asterisks":"PO1 Smarter Europe, PO2 Greener Europe and JTF","_9_indicator_usage_by_specific":"RSO1.7 Defence industrial capacities and capabilities, RSO1.6 Contributing to strategic technologies, RSO2.9 Contributing to clean strategic technologies and JSO8.1 JTF","_10_definition_and_concepts":"The indicator counts all enterprises that receive monetary or in-kind support primarily for economic activities linked to the production of dual-use items, defined as “items, including software and technology, that can be used for both civil and military purposes” following Regulation (EU) 2021/821, or contributing to defence capabilities.\nFor the definition of an enterprise see RCO01.","_11_data_collection":"MA monitoring system","_12_time_measurement_achieved":"It depends on the type of support: grant (see RCO02), financial instruments (see RCO03) or non-monetary (see RCO04).","_13_aggregation_issues":"Rule 1: Double counting removed at the level of the specific objective\nAn enterprise is counted once regardless of how many types of support (ex: grants and financial instrument support) it receives from operations in the same specific objective.","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date for total RCO128 (CPR Annex VII, Table 5).","_15_references":"See RCO01\nFor definition of dual use: Regulation (EU) 2021/821 of the European Parliament and of the Council of 20 May 2021 setting up a Union regime for the control of exports, brokering, technical assistance, transit and transfer of dual-use items (recast)","_16_corresponding_corporate":"-","_17_notes":"This indicator was introduced in 2025, with the amendment of Regulations (EU) 2021/1058 and (EU) 2021/1056 in the context of the mid-term review.\nUse together with indicator RCO01 and with indicators for forms of support (RCO02, RCO03, RCO04)","_18_link_to_2014_2020_common":"NEW","_0_erdf":true,"_0_cohesion_fund_72":true,"_0_just_transition_fund_64":true,"edited_by_swd_2025_346":"NEW"}
,{"_1_indicator_code":"RCO129","_2_indicator_name":"Infrastructure adapted to military mobility requirements","_2b_indicator_code_and_short":"RCO129 Infrastructure adapted to military mobility","_3_measurement_unit":"projects","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":"not applicable","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_9_indicator_usage_by_specific":"RSO3.3 Military mobility","_10_definition_and_concepts":"This indicator counts all funded projects that aim to adapt infrastructure to meet dual use military mobility requirements. Such requirements are laid down in Commission Implementing Regulation (EU) 2021/1328.\nCohesion policy can support military mobility and related investments in transport infrastructure, notably dual use transport infrastructure along the EU priority military mobility corridors. For example, cohesion policy funds may be used to upgrade ports, roads, rail, bridges, tunnels, etc., to ensure the easy transportation of heavy military equipment and machinery, prioritising key bottlenecks on the military mobility corridors.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Commission Implementing Regulation (EU) 2021/1328","_16_corresponding_corporate":"-","_17_notes":"This indicator was introduced in 2025, with the amendment of Regulations (EU) 2021/1058 and (EU) 2021/1056 in the context of the mid-term review.\nWhere relevant this indicator should be used together with output and result indicators for the mode of transport infrastructure enhanced.","_18_link_to_2014_2020_common":"NEW","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_346":"NEW"}
,{"_1_indicator_code":"RCO29","_2_indicator_name":"Capacity of multi-purpose shelters built or renovated","_2b_indicator_code_and_short":"RCO29 Capacity of multi-purpose shelters","_3_measurement_unit":"persons","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":"not applicable","_7_target_2029":">0","_8_policy_objective_asterisks":"PO3 Connected Europe","_9_indicator_usage_by_specific":"RSO3.3 Military mobility","_10_definition_and_concepts":"The indicator covers new purpose-built shelters, the renovation of existing shelters or the adaptation of other infrastructures to be used as shelters. Multi-purpose shelters protect lives in times of military conflict or natural disasters, but in regular times also serve the needs of local communities. Examples include public transport infrastructures (e.g. transport terminals, subway stations), schools, community centres, public sports facilities and housing, that are convertible to emergency shelters.\nShelters may be part of wider construction and renovation projects and may be eligible as any other ancillary elements to buildings.\nMaintenance and repairs are not covered.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"Double counting should be removed at the level of the specific objective","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"-","_16_corresponding_corporate":"-","_17_notes":"This indicator was introduced in 2025, with the amendment of Regulations (EU) 2021/1058 and (EU) 2021/1056 in the context of the mid-term review.","_18_link_to_2014_2020_common":"NEW","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_346":"NEW"}
,{"_1_indicator_code":"RCO131","_2_indicator_name":"Energy transmission or distribution network lines and interconnectors - newly constructed or improved","_2b_indicator_code_and_short":"RCO131 Energy: energy interconnectors","_3_measurement_unit":"km","_4_type_of_indicator":"output","_5_baseline":"0","_6_milestone_2024":"not applicable","_7_target_2029":">0","_8_policy_objective_asterisks":"PO2 Greener Europe","_9_indicator_usage_by_specific":"RSO2.12 Energy interconnectors and recharging infrastructure","_10_definition_and_concepts":"Total length of energy interconnectors and transmission or distribution lines newly constructed or upgraded.\nBy analogy to the definition of interconnectors in the electricity market Regulation, the indicator covers infrastructure that allows the flow of energy (1) between Member States, or (2) between separate energy grids inside the same Member State (such as island to mainland), or (3) in specific and well justified cases also between Member States and third countries if, in line with Article 63(4) of Regulation (EU) 2021/1060, the operation contributes to the objectives of the programme.\nThe indicator also covers internal transmission and distribution lines, as well as additional supporting infrastructure, that are needed to make full use of interconnectors, the expansion of existing interconnectors, and the improvement of existing interconnectors’ resilience, security and digitalisation, when kilometers are a relevant measurement unit.\n“Interconnectors” are expected to refer in practice mostly to electricity interconnectors, but can also in principle cover hydrogen and natural gas interconnectors within the limits set out by Article 7 of the ERDF Regulation.","_11_data_collection":"Supported projects","_12_time_measurement_achieved":"Upon completion of output in the supported project.","_13_aggregation_issues":"-","_14_reporting":"Rule 1: Reporting by specific objective\nForecast for selected projects and achieved values, both cumulative to date  (CPR Annex VII, Table 5).","_15_references":"Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast)","_16_corresponding_corporate":"-","_17_notes":"This indicator was introduced in 2025, with the amendment of Regulations (EU) 2021/1058 and (EU) 2021/1056 in the context of the mid-term review.","_18_link_to_2014_2020_common":"NEW","_0_erdf":true,"_0_cohesion_fund_72":true,"edited_by_swd_2025_346":"NEW"}]
